Methods and systems for testing terminal
A terminal testing and terminal technology, applied in the field of communication, can solve problems such as complex script generation and additional control of playback execution, and achieve the effect of reducing the number of generation, data volume, and system burden
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0057] In the solution of Embodiment 1 of the present invention, it is considered that under the current terminal test mode of recording and playback mode, it is necessary to record the duration of each operation event itself, and add the duration corresponding to the recorded operation time to the event element, becomes an event element of the event. In this case, since the duration of each operation event is recorded, the amount of information of the event elements recorded in the test period is very large, which makes the process of generating test scripts very complicated; at the same time, because the test terminal according to the test script When performing event playback, it is necessary to time the duration corresponding to each operation event, which increases the burden on the test terminal when performing event playback. In this regard, Embodiment 1 of the present invention proposes a terminal testing method, such as figure 1 As shown, the content of event element...
Embodiment 2
[0074] The embodiment of the present invention also provides a terminal testing system, such as figure 2 As shown, the system includes: an interval determination module 11, a comparison module 12, a recording module 13 and a playback module 14, wherein: the interval determination module 11 is used to determine that in each adjacent two operation events performed on the test terminal, the preceding one The time interval between the beginning of the operation event and the beginning of the next operation event; the comparison module 12 is used to compare the time interval with the first set threshold; the recording module 13 is used to record the event element of each operation event, if the time If the interval is less than the first set threshold, the duration of the previous operation event is not recorded; otherwise, the time interval is regarded as a delay event, and the delay event is set between the previous operation event and the next operation event between; the playb...
Embodiment 3
[0077] In the solution of the third embodiment of the present invention, it is considered that under the current terminal test mode of recording and playback mode, if the tester performs a character input operation event, each time a character is input, a button press operation event and a button need to be recorded. Lifting operation event, further, if it is an operation event of input string, you need to record a large number of button press operation events and button lift operation events, therefore, it will bring a large number of redundant events to the test script, seriously affecting Efficiency of the test terminal when playing back according to the test script. In this regard, Embodiment 3 of the present invention proposes a terminal testing method, such as image 3 As shown, the recorded redundant operation events can be greatly reduced, and the efficiency when the test terminal plays back the character input operation events can be improved.
[0078] The scheme of ...
PUM

Abstract
Description
Claims
Application Information

- R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com