Method for reinforcing overlying shallow rockmass in mined-out area
A technology for gobs and rock masses, applied in mining equipment, earth square drilling, fillings, etc., can solve problems such as unpredictable filling effects in goafs, difficult grout filling, bleeding and large shrinkage, and achieve concrete slab And the grouting technology is mature, the construction cost is saved, and the treatment effect is guaranteed
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0030] Below in conjunction with accompanying drawing, structure, measure of the present invention are described in detail.
[0031] figure 1 It is the plan view of the superficial reinforcement structure of the overlying rock mass in the goaf. After the anchor pile is formed, the concrete slab 1 is poured on the ground, and double-layer reinforcement is arranged. The exposed part of the anchor pile threaded steel bar 4 is welded with the reinforcement in the concrete slab 1. When the pouring interruption time exceeds 30 minutes, use the end formwork to set up horizontal construction joints. When continuing to pour, chisel the surface of the joint and rinse it with clean water. Continue pouring when the surface is wet but no water. The construction joints should be staggered from each other.
[0032] figure 2 It is the A-A cross-sectional view of the shallow reinforcement structure of the overlying rock mass in the goaf. Firstly, a machine is used to construct boreholes 2...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 