A low-temperature storage tank and construction method technology, which is applied to building types, large-capacity bulk material storages, buildings, etc., can solve the problems of long construction period, difficult installation accuracy, and many installation hidden dangers, and achieves high installation accuracy and convenient construction. Safety and time-saving effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0022] The construction method of a double-hull large cryogenic storage tank according to the present invention comprises the following steps:
[0023] A. Flip-chip assembly outer tank
[0024] The outer tank wall is assembled and welded by strip plates, the lowest strip plate is the first strip plate, and the uppermost strip plate is the Mth strip plate. The assembly procedure of the outer tank wall is as follows: (1) Put the Mth strip plate Assemble with the M-1 belt plate, (2) Assemble the vault with the M-th belt plate, (3) Install the inner ceiling, (4) Assemble the M-2 belt plate to the M-1 belt plate in order from top to bottom 1 belt plate, (5) pair the 1st belt plate with the base plate;
[0025] When hoisting the outer tank, use 56 hoisting columns arranged on the bottom plate, and the hoisting columns are equipped with chain hoists to lift the outer tank wall belt plate;
[0026] The vault of the outer tank is a steel grid structure, and ring beams and pressure b...