Soft-soil foundation treatment method for expressway engineering
A technology for weak soil foundations and highways, applied to roads, roads, buildings, etc., can solve the problems of difficult control of the dosage of admixtures, discrete pile body strength, and uneven stirring of the pile body, etc., achieving a significant compaction effect, The effect of improving the strength of the skeleton and enhancing the connection force
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0021] a. Equipped with filler: mix powdered lime and soil with a volume ratio of 6%:94% to equip lime-improved soil;
[0022] b. Use a cylindrical weight of 35 cm in diameter and 3 tons to ram the weak ground into holes according to the method of ramming at intervals;
[0023] c. For each rammed hole, use 0.08 cubic meters of lime-improved soil for each backfill. According to the construction method of 3 meters of heavy hammer drop distance and 4 consecutive ramming, the method of filling, ramming, refilling, and ramming is implemented. Pile up to the surface of the foundation.
Embodiment 2
[0025] a. Equipped with fillers: mix powdered lime and soil with a volume ratio of 4%:96% with lime-improved soil;
[0026] b. Use a columnar hammer with a diameter of 45 cm and a weight of 5 tons to ram the weak ground into holes according to the method of ramming at intervals;
[0027] c. For each rammed hole, use lime-improved soil of 0.15 cubic meters of backfill. According to the construction method of 5 meters of heavy hammer drop distance, continuous ramming 6 times, the method of filling, ramming, refilling, and ramming is implemented. Pile up to the surface of the foundation.
Embodiment 3
[0029] a. Equipped with fillers: mix powdered lime and soil with a volume ratio of 8%: 92% with lime modified soil;
[0030] b. Use a columnar hammer with a diameter of 40 cm and a weight of 4 tons to ram the soft ground into holes according to the method of ramming at intervals;
[0031] c. For each rammed hole, use 0.10 cubic meter of lime-improved soil for each backfill, and implement the method of filling, ramming, refilling, and ramming according to the construction method of 4 meters of heavy hammer drop distance and continuous ramming 5 times. Pile up to the surface of the foundation.
PUM
Property | Measurement | Unit |
---|---|---|
Diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com