Integral lifting system and construction method for arch bridge ribs

A technology of overall lifting and arching ribs, which is applied in bridges, bridge construction, erection/assembly of bridges, etc., can solve problems such as long construction period, influence on navigation, and large investment, so as to improve construction quality, shorten construction period, and improve constructability Improved effect

Inactive Publication Date: 2012-07-11
GUANGDONG PROVINCE COMM PLANNING & DESIGN INST
View PDF7 Cites 34 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Each construction scheme has its own advantages and disadvantages. The cable hoisting method requires a large-tonnage cable crane, and the second requires the assembly of two higher towers, and the installation of buckle cables, back cables and ground anchors, such as bridge positions. The terrain is gentle, and the use of cable cranes requires a large investment and high cost; the construction of the full hall support method requires a large amount of support materials, and secondly, it affects navigation and has a long construction period. It is mainly suitable for arch bridges with small spans and no navigation requirements; Solid construction can reduce a large number of high-altitude operations, the construction is safe, and can greatly reduce the interference to the water traffic under the bridge. However, due to the limited capacity and economy of the rotating system, it is only suitable for small and medium-span arch bridges.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Integral lifting system and construction method for arch bridge ribs
  • Integral lifting system and construction method for arch bridge ribs
  • Integral lifting system and construction method for arch bridge ribs

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0032] Such as Figure 1 to Figure 4 An overall hoisting system for the arch rib of an arch bridge is shown, which includes a triangular rigid frame 10 of the arch bridge, a lifting station 1, an arch rib support 9, an arched integral arch rib 4 and a barge 8 for transporting the integral arch rib 4 , the triangular rigid frame 10 is a pair, and the pair of triangular rigid frames 10 are fixedly erected on the pier 12, symmetrically arranged on both sides of the main span of the arch bridge, and each triangular rigid frame 10 is provided with an integral arch bridge near the inner side of the main span of the arch bridge. The arch rib closing section 5 where the rib 4 is closed, and two lifting stations 1 are also arranged on two triangular rigid frames 10, and the arch rib support 9 is erected on the barge 8, and the arch rib support 9 supports the whole arch rib 4, The lifting station 1 is connected to the integral arch rib 4 by lifting the steel strand 3, and the lifting st...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses an integral lifting system and a construction method for arch bridge ribs. The integral lifting system comprises a pair of triangular steel frames, two lifting stations, arch rib brackets and an integral arch rib of an arch bridge, and a barge for conveying the integral arch rib. The triangular steel frames are fixedly rested on bridge piers and symmetrically disposed on two sides of main span of the arch bridge, an arch rib closure section in closure with the integral arch rib is disposed on the inner side of the arch bridge main span and close to the corresponding triangular steel frame, the lifting stations are disposed on the triangular frames respectively, the arch rib brackets are rested on the barge and support the integral arch rib, the lifting stations are connected with the integral arch rib through lifting steel stranded wires, the integral arch rib which is lifted up is in fixed closure with the arch rib closure sections, and accordingly the integral arch bridge is formed. The integral lifting system is adaptable to severe construction environments, and accordingly construction progress is quickened. The invention further provides the construction method for integral lifting of the arch bridge rib.

Description

technical field [0001] The invention relates to a lifting system and a construction method for an arch rib of an arch bridge, in particular to an overall lifting system and a construction method for an arch rib of an arch bridge. Background technique [0002] At present, the construction schemes of domestic arch bridge arch ribs include: cable hoisting scheme; Each construction scheme has its own advantages and disadvantages. The cable hoisting method requires a large-tonnage cable crane, and the second requires the assembly of two higher towers, and the installation of buckle cables, back cables and ground anchors, such as bridge positions. The terrain is gentle, and the use of cable cranes requires a large investment and high cost; the construction of the full hall support method requires a large amount of support materials, and secondly, it affects navigation and has a long construction period. It is mainly suitable for arch bridges with small spans and no navigation requ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E01D21/00
Inventor 梁立农陈万里魏朝桂何海王强姜启珍
Owner GUANGDONG PROVINCE COMM PLANNING & DESIGN INST
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products