[0004] The solution to the multi-layer gas storage well body of the present invention is to aim at the disadvantages existing in the use process of the double-
pipe underground
natural gas high-pressure gas storage well. It not only tightly wraps the outer surface of the gas storage cylinder, but also tightly connects the inner layer of the gas storage cylinder with the outer cylinder to strengthen the inner layer of the gas storage cylinder to reduce the adverse effects of alternating loads on the gas storage cylinder during use. In addition, since the inner gas
storage tank, the cement protection reinforcement layer and the outer cylinder are fastened together, there is no cavity or gap in the middle, not only the
surface water is difficult to infiltrate, even if the outer cylinder due to cementing defects During the use of the gas storage cylinder, it is corroded by
groundwater and harmful gases, causing perforation, etc. Since the outer surface of the gas storage cylinder has a layer of cement protection and strengthening layer that tightly wraps it, it can still effectively protect the gas storage cylinder from damage and ensure high-pressure gas storage wells service life; in order to ensure that the cement protection reinforcement layer not only tightly wraps the outer surface of the gas storage cylinder, but also tightly connects the inner gas storage cylinder and the outer cylinder body into one effect, the fixing method of the multi-layer gas storage well cylinder body of the present invention is: First, use geological drilling to open a foundation well, then lower the outer cylinder with a grouting hole at the bottom into the foundation well and insert the grouting
pipe into the outer cylinder, and its lower end communicates with the grouting hole at the bottom of the outer cylinder, and then start grouting The pump pours
cement slurry between the outer cylinder and the foundation well from bottom to top. When the
cement slurry overflows the ground, stop pouring and open the
upper joint of the grouting
pipe, install the rubber plug (grouting process hole), and then start the grouting pump to remove the rubber plug. After pushing into the grouting process hole at the bottom of the outer cylinder, stop the pump; then pull the lower end of the grouting pipe away from the grouting process hole at the bottom of the outer cylinder to clean the inner cavity of the outer cylinder; then inject the inner cavity of the outer cylinder with a volume of 30 -50% retarding cement, finally sink the air storage cylinder with head and centralizer into the inner cavity of the outer cylinder filled with retarding cement, in order to ensure that the air storage cylinder sinks in place, inject fluid medium into the air storage cylinder as The counterweight is used to overcome the
buoyancy of the retarded
cement slurry until the air storage cylinder sinks in place and the retarded cement
slurry overflows the upper mouth of the outer cylinder. After the retarded cement solidifies the air storage cylinder and the outer cylinder into one, pull out Fluid counterweight; after the multi-layer gas storage well body of the present invention is fixed and completed, the required
wellhead device can be installed on the upper mouth of the gas storage well body according to requirements, which can be used to store high-pressure fuel gas