Oblique-crossing inclined shaft upper arc guide top brushing construction method for soft crushed rock layer
A construction method and technology for inclined wells, which are applied in wellbore lining, shaft equipment, earth-moving drilling, etc., to achieve significant economic benefits, speed up construction progress, and optimize stress-bearing structures.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
example
[0031] The whole tunnel of Wujialing Tunnel, a railway channel in central and southern Shanxi, is mainly composed of sandstone, argillaceous sandstone, and mudstone. It is strongly weathered to weakly weathered, with developed joints and fissures, broken rock mass, and loose structure. The intersection of the No. 1 inclined shaft and the main tunnel is rich in water , The vault is easy to fall off and collapse. It belongs to weak and broken rock formations. The inclined shaft and the main cave are obliquely intersected. The design is a small pilot tunnel roofing scheme, with temporary support for the shed hole.
[0032]After analysis: the surrounding rock structure of the top section is complex, the rock mass is broken and rich in water, and the safety risk is extremely high. If the design roofing scheme is adopted, the main problems are: the temporary support section of the small pilot tunnel steel arch shed tunnel is trapezoidal, which is easy to collapse in the weak and bro...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com