Sequence construction method for large area reinforced concrete floors
A technology of reinforced concrete and construction method, which is applied in the processing of floors, building materials, construction, etc. It can solve the problems of post-pouring belt retention time, construction troubles, and influence on construction progress, etc., to achieve the effect of crack control, convenient construction, and shorten the construction time. The effect of duration
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Example Embodiment
[0023] The above-mentioned content of the present invention will be further described in detail below in conjunction with specific embodiments.
[0024] However, it should not be understood that the scope of the above-mentioned subject of the present invention is limited to the following embodiments. Without departing from the above-mentioned technical ideas of the present invention, various substitutions and changes based on common technical knowledge and conventional means in the field should be included in the scope of the present invention.
[0025] Combine figure 1 , figure 2 , image 3 Specifically describe the construction method of the present invention:
[0026] (1) The "jumping warehouse method" construction is roughly divided into areas with a length and width not greater than 50m according to the area of the slab, and numbering in any direction. The steel bars of the slab can be tied in an orderly manner according to the construction arrangement, and the concrete is p...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap