Device for conducting construction simulation through building information model (BIM)

A construction plan and model technology, applied in special data processing applications, instruments, electrical digital data processing, etc., can solve problems such as the negative impact of project schedule and cost control, the tight schedule of disaster recovery centers, and the complex equipment system, so as to improve the project. Construction and operation and maintenance management level, low manufacturing cost, and the effect of reducing risks

Active Publication Date: 2012-12-12
SHANGHAI MUNICIPAL ELECTRIC POWER CO +2
View PDF5 Cites 23 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] (1) The disaster recovery center has a lot of equipment and complex systems, and the direction of pipelines in a limited space is very complicated. Because traditional CAD drawings use two-dimensional methods for design and drawing, there are inevitably direct collisions between equipment, pipelines, and structures. In the past, These tasks need to be comprehensively coordinated by the construction company and the design unit on the construction site, which will have a negative impact on the project schedule and cost control
[0005] (2) The construction period of the disaster recovery center is very tight, and the team involved in the project is complex
[0006] (3) The investment in the disaster recovery center is strictly controlled. However, due to the large number of equipment and complex systems, the statistics of equipment and material engineering quantities that account for an important proportion of the project cost often refer to the estimated budget data provided by the design unit and the construction unit. As the owner, there is no effective management tools
Efficiency reduction or failure of any part will lead to a reduction in the availability of IT services, ranging from poor information access to various unpredictable major losses

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Device for conducting construction simulation through building information model (BIM)

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0019] Such as figure 1 As shown, a device for construction simulation through BIM, the device includes a BIM model database memory 1, a construction plan storage database memory 5, a processor 2, a power module 4, a display 3, and a comparator 6. The processor 2 is respectively connected with the BIM model database memory 1, the construction scheme storage database memory 5, the power supply module 4, the display 3, and the comparator 6. The power module provides 220V voltage. The display is an LCD display. The processor generates construction process information according to the BIM model data in the BIM model database memory, and then compares and judges the construction process information with the construction plan information stored in the construction plan storage database memory through a comparator to obtain optimal construction process information.

[0020] Application of the present invention can carry out:

[0021] 1) Construction simulation progress control.

...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a device for conducting construction simulation through a building information model (BIM). The device comprises a BIM data base memory, a construction scheme storage data base memory, a processor, a power supply module, a display and a comparer. The processor is respectively connected with the BIM data base memory, the construction scheme storage data base memory, the processor, the power supply module, the display and the comparer. Compared with prior art, the device has the advantages of being simple in structure, low in manufacture cost and capable of helping engineering building projects to improve efficiency, reduce risks and improve construction, operation, maintaining and management levels of the projects and the like.

Description

technical field [0001] The invention relates to a construction simulation device, in particular to a construction simulation device using BIM. Background technique [0002] BIM (Building Information Modeling, or Building Information Modeling) is another important computer application technology that appears in the engineering construction industry after CAD (Computer Aided Design) technology, and is triggering an unprecedented revolution in the construction industry. This technology uses digital modeling software to improve the efficiency of project design, construction and management, and brings great added value to construction companies that adopt this technology. [0003] Shanghai Disaster Recovery Center is one of the three centralized information system disaster recovery centers built by State Grid Corporation of China. This project involves many specialties, complex equipment systems, tight construction schedules, and high requirements for cost control of materials a...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06F17/50
Inventor 黄蓓琦张斌季彤天何真珍
Owner SHANGHAI MUNICIPAL ELECTRIC POWER CO
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products