[0017] A 180-ton RH furnace is used. Pre-slag containing Al 2 o 3 39.5wt%, CaO 46.1wt%. The carburant contains C95.4 wt%.
[0018] 1. Before the aluminum recycling operation in the RH furnace, deep deoxidation of molten steel is carried out with aluminum, and the mass percentage of Als in molten steel is controlled at 0.006%.
[0019] 2. The temperature of molten steel in the ladle is controlled at 1612°C.
[0020] 3. The vacuum pressure of the RH furnace vacuum chamber is controlled at 61Pa, and the lifting gas flow rate of the insertion tube is 75Nm 3 / h, the depth of the insertion tube immersed in molten steel is controlled at 450mm.
[0021] 4. After the molten steel is deoxidized, add 450 kg of pre-melted slag and 28 kg of recarburizer into the molten steel.
[0022] After 3 minutes of melting and reaction, the mixed slag is discharged to the vacuum chamber, and the molten steel circulates evenly after 2 minutes without adding any alloy or aluminum. After sampling...
Embodiment 2
[0024] A 180-ton RH furnace is used. Pre-slag containing Al 2 o 3 30wt%, CaO 58wt%. The carburant contains C93 wt%.
[0025] 1. Before the aluminum recovery operation in the RH furnace, the aluminum is used for deep deoxidation of the molten steel, and the mass percentage of Als in the molten steel is controlled at 0.011%.
[0026] 2. The temperature of molten steel in the ladle is controlled at 1644°C.
[0027] 3. The vacuum pressure of the RH furnace vacuum chamber is controlled at 42Pa, and the lifting gas flow rate of the insertion tube is 14Nm 3 / h, the depth of the insertion tube immersed in molten steel is controlled at 590mm.
[0028] 4. After the molten steel is deoxidized, add 1420 kg of pre-melted slag to the molten steel, and add 71 kg of recarburizer at the same time.
[0029] After 4 minutes of melting and reaction, the mixed slag is discharged to the vacuum chamber, and the molten steel circulates evenly after 2 minutes without adding any alloy or aluminu...
Embodiment 3
[0031] A 180-ton RH furnace is used. Pre-slag containing Al 2 o 3 45wt%, CaO 41wt%. The carburant contains C94.8wt%.
[0032] 1. Before the aluminum recycling operation in the RH furnace, deep deoxidation of molten steel is carried out with aluminum, and the mass percentage of Als in molten steel is controlled at 0.022%.
[0033] 2. The temperature of molten steel in the ladle is controlled at 1560°C.
[0034] 3. The vacuum pressure of the RH furnace vacuum chamber is controlled at 46Pa, and the lifting gas flow rate of the insertion tube is 130Nm 3 / h, the depth of the insertion tube immersed in molten steel is controlled at 490mm.
[0035] 4. After the molten steel is deoxidized, add 1100 kg of pre-melted slag to the molten steel and add 50 kg of recarburizer at the same time.
[0036] After 4 minutes of melting and reaction, the mixed slag is discharged to the vacuum chamber, and the molten steel circulates evenly after 2 minutes without adding any alloy or aluminum....