Tunnel track-bed ballast replacing machine
A technology of tunnel road and ballast machine, applied in the direction of road, track, ballast layer, etc., can solve the problems of bulky, inapplicable, complex structure, etc., achieve good effect, strong applicability, and liberate manual labor
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0070] Embodiment one : figure 1 It is a front view of the overall structure when a preferred embodiment of the ballast changing machine for tunnel ballast bed according to the present invention is in working state, figure 2 for figure 1 The ballast replacement circuit diagram of the shown embodiment, image 3 for figure 1 Front view of the vacuum conveying device of the illustrated embodiment, Figure 4 for image 3 The A-A sectional view of the front view shows that the tunnel ballast changing machine in this embodiment includes a vehicle frame 1, a bogie 10 is installed on the lower part of the vehicle frame 1, a cab 2 is arranged on the upper part of the vehicle frame 1, and an engine room is installed on the vehicle frame 1. 4 and the compressor room 6, the main conveyor belt 5 is arranged on the frame 1, the main conveyor belt 5 is connected with the dirt conveyor belt 3, and the main conveyor belt 5 is connected with the vacuum conveying device 7.
[0071] In th...
Embodiment 2
[0123] Embodiment two , a ballast changing machine for a tunnel ballast bed, the difference is that the excavating device includes a main shaft, and the main shaft includes four excavating buckets, and the four excavating buckets are evenly distributed in the circumferential direction of the main shaft.
[0124] The working method of the tunnel ballast changing machine described in the above-mentioned embodiment is: before the ballast changing machine works, excavate a 500 mm deep and 800 mm wide ditch at the bottom 8 of the tunnel ballast bed in the section to be ballasted, and transfer the tunnel ballast bed ballast changing machine to the screw conveyor The excavator 12 and the excavating device 13 are placed in the ditch at the bottom 8 of the tunnel bed as a whole, and the draw bar 9 below the vacuum conveying device 7 is quickly connected to the vehicle frame 1, so that the vacuum conveying device 7 is put down, and the rectangular vacuum tube is connected to the screw. ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 