Construction method of concrete cylinder buried in soft ground and its special hole forming device
A concrete and soft foundation technology, applied in earthwork drilling, infrastructure engineering, liquid/gas jet drilling, etc., can solve the problems of long construction hours, high equipment requirements, and high equipment cost of concrete cylinders, and achieve easy compression , increase the construction depth, improve the effect of construction speed
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0017] See attached picture. This embodiment comprises a gland 1, an inner protective wall sleeve 3 and an outer protective wall sleeve 2, and the side of the outer protective wall sleeve 2 is provided with a filling port 12; The cover 1 is connected, and the upper end of the inner wall casing 3 forms a tapered tube 4 inserted into the pressure head 5 placed above the gland 1, and is connected with the mud outlet 6 in the pressure head 5; the inner wall sleeve The lower end of the tube 3 and the outer wall casing 2 is covered with a cylindrical shoe 8, the lower end of which forms a cutting edge 7; The outer support surface 10 and the inner support surface 11; the boot 8 is inserted into the cylinder hole 9 between the inner wall casing 3 and the outer wall casing 2; the cutting edge 7 at the lower end of the boot 8 is serrated The upper end of the boot 8 cooperates with the inner wall casing 3 and the outer wall casing 2 with a ratchet structure 21; a plurality of ring gears...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 