Modified asphalt and preparation method thereof
A modified asphalt and thermoplastic technology, applied in building components, building insulation materials, buildings, etc., can solve the problems of road performance not meeting high road requirements, complex production process, huge energy waste, etc., to reduce traffic accidents , Excellent road performance and excellent adhesion performance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0021] A modified bitumen is prepared by the following method:
[0022] A. Material preparation
[0023] Coumarone resin and carbon five resin with a mass ratio of 3:2: 46 parts; rubber process oil: 14 parts; naphthenic oil: 10 parts; SBS: 14 parts; polypropylene wax: 0.02 parts.
[0024] B. Production steps
[0025] Add the above-mentioned amount of petroleum resin, rubber process oil, and naphthenic oil into an oil bath device kept at 155°C to 160°C, with stirring, until the petroleum resin melts, then add the above-mentioned SBS and polypropylene wax gradually. Continue to stir for 18min to 22min, while keeping the temperature of the oil bath at 155°C to 160°C.
[0026] After the material is fused evenly, it enters the shearing device, the shearing rate is controlled at 5500r / min-6000r / min, and the shearing time is 24min-27min. After shearing, the modified bitumen of the present invention is obtained.
[0027] The road performance indicators of the modified asphalt prep...
Embodiment 2--5
[0032] Carry out by following processing parameter, other are all identical with embodiment 1. The prepared modified asphalt has a penetration (25°C, 100g, 5s) (0.1mm) of 54.1-54.5, a ductility (5cm / min, 5°C) of 24.03-24.20, and a softening point (ring and ball method) of 65-68. , Flash point (COC) is 227-232, viscosity (135°C) is 1.624-1.634.
[0033]
[0034]
Embodiment 6
[0036] With the modified bitumen that embodiment 1~5 obtains, make some Marshall test blocks according to " highway engineering asphalt and bituminous mixture test regulation ", experimental method is according to T0702-2011 middle asphalt mixture test piece preparation method (compaction method ), the Marshall sample block is made according to the standard sample in the regulations, the red coloring agent is added to the sample, and the height of the standard sample is 63.5mm±1.3mm. After the prepared sample is placed in the mold stably for 24 hours, the standard Marshall test piece is obtained. Continuously observe and monitor the color change, and put them into -18℃ low temperature, normal temperature, and 120℃ high temperature environment for 24 hours to observe the color change. Under low temperature and normal temperature, the color is stable and bright, and it becomes lighter in high temperature environment. After research, it is found , the phenomenon of lightening of ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 