One-time continuous pouring and multi-cycle real-time temperature control construction technology of super-large-volume concrete
A construction technology and multi-cycle technology, which is applied in the direction of construction, building structure, and building material processing, can solve the problems of little effect, labor, and material waste, and achieve obvious effects, reduce construction costs, and ensure safety. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0272] Wuhu Bozhuang Spring Blossom Phase V new construction project
[0273] The project is located at Weiqi Road, Wushi Road, Wuhu City, Anhui Province. The frame-shear structure consists of 1 floor underground and 28 floors above the ground, with a total construction area of 98,630m2 2 . The foundation floor is composed of main building rafts (H=3800mm) and podium rafts (H=1700mm), and the underground building area is 30099m 2 , is a super-large volume concrete floor. The base plate pouring construction is in the high temperature period in summer from July to August (the average daytime temperature is above 35 degrees).
[0274] The project adopts this technology, and the interior of the raft foundation is preset in groups according to the circulating pipe network, the surface of the raft foundation is stored and maintained, and the precipitation recharge and rainwater collection system on the construction site are adopted. The combined dual-control monitoring method a...
Embodiment 2
[0276] Wuhu Shimao Riverside Garden 4-1# plot characteristic commercial street project
[0277] The project is located on Beijing West Road, Wuhu City, Anhui Province, with a total construction area of 78463m 2 , one basement floor, with an underground building area of about 21,230m 2 , the thickness of the basement floor is 800mm, the thickness of the cap is mainly 2200mm and 2600mm, and the maximum thickness of the core tube foundation concrete is 5300mm. The concrete pouring of the basement floor was at the end of July, which was midsummer and the average daily temperature was above 30°C. This project applies this technology, and the circulating pipe network is preset in groups in the raft foundation. The internal circulation water and the surface water storage and maintenance water of the raft foundation come from the groundwater of precipitation, as well as the precipitation recharge and rainwater collection system on the construction site. The dual-control monitori...
Embodiment 3
[0279] Wuhu Shimao Riverside Garden 5# plot hotel and office building project
[0280] The project is located in Xinwu Road, Wuhu City, Anhui Province, with a frame-shear structure and a total construction area of 96,505m 2 , underground construction area of 22000m 2 , 26 floors above ground, 2 floors underground, the thickness of the basement floor is 1000mm, the thickness of the cap is mainly 2300mm and 2800mm, and the maximum thickness of the core tube foundation concrete is 5200mm.
[0281] The project has successfully applied this process. The circulation pipe network is preset in groups according to the inside of the foundation floor. The internal circulation water comes from the groundwater of precipitation. The system realizes the real-time temperature control system of large-scale water system (water network) that realizes "circulating water heat dissipation, surface water storage, heat preservation and maintenance, external precipitation recharge and rainwater c...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com



