Bus duct assembling manufacturing flow process
A technology of busway and technology, which is applied in the field of busway, can solve the problems of inconvenient installation, construction and connection of multi-channel cables, and the failure of cables to meet requirements, etc., and achieve the effects of convenient branching, strong overload capacity, and prevention of overload and fire
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0026] 1. A bus duct assembly manufacturing process, characterized in that it includes the following steps:
[0027] a. The copper bars in the busway are ready, first cut the length and size of the copper bars;
[0028] b. The copper bars of the standard length are punched with connection holes at both ends;
[0029] c. As mentioned above, the copper bars that need to be welded should be welded first, and then the safety list should be cut, and finally the copper bar connection holes should be punched. If the copper bars are punched with burrs, the burrs should be dealt with first, and then brushed and plated;
[0030] d. The length of the brush-plating copper row of the busway is 15cm;
[0031] e. The length of the sleeve of the heat-shrinkable tube to be prepared is, for example, a copper bar of 3 meters, the length of the sleeve is 2.95 cm, and the length of the sleeve of the heat-shrinkable tube is 2.5 to 3.8 cm;
[0032] f. Cut the two ends of the heat-shrinkable tube t...
Embodiment 2
[0040] 1. A bus duct assembly manufacturing process, characterized in that it includes the following steps:
[0041] a. The copper bars in the busway are ready, first cut the length and size of the copper bars;
[0042] b. The copper bars of the standard length are punched with connection holes at both ends;
[0043] c. As mentioned above, the copper bars that need to be welded should be welded first, and then the safety list should be cut, and finally the copper bar connection holes should be punched. If the copper bars are punched with burrs, the burrs should be dealt with first, and then brushed and plated;
[0044] d. The length of the brush-plating copper row of the bus duct is 12cm;
[0045] e. The length of the sleeve of the heat-shrinkable tube is such as 3 meters of copper bar, the length of the sleeve is 2.95cm, and the length of the sleeve of the heat-shrinkable tube is 2.5cm;
[0046] f. Cut the two ends of the heat-shrinkable tube to 6cm after heat-shrinking, an...
Embodiment 3
[0054] 1. A bus duct assembly manufacturing process, characterized in that it includes the following steps:
[0055] a. The copper bars in the busway are ready, first cut the length and size of the copper bars;
[0056] b. The copper bars of the standard length are punched with connection holes at both ends;
[0057] c. As mentioned above, the copper bars that need to be welded should be welded first, and then the safety list should be cut, and finally the copper bar connection holes should be punched. If the copper bars are punched with burrs, the burrs should be dealt with first, and then brushed and plated;
[0058] d. The length of the brush-plating copper row of the busway is 13cm;
[0059]e. The length of the sleeve of the heat-shrinkable tube to be prepared is, for example, a copper bar of 3 meters, the length of the sleeve is 2.95 cm, and the length of the sleeve of the heat-shrinkable tube is 3.3 cm;
[0060] f. Cut the two ends of the heat-shrinkable tube to 7cm af...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com