Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Bus duct assembling manufacturing flow process

A technology of busway and technology, which is applied in the field of busway, can solve the problems of inconvenient installation, construction and connection of multi-channel cables, and the failure of cables to meet requirements, etc., and achieve the effects of convenient branching, strong overload capacity, and prevention of overload and fire

Inactive Publication Date: 2014-12-03
JIANGSU HAIWEI GROUP
View PDF0 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] With the emergence of modern engineering facilities and equipment, the power consumption of all walks of life is increasing rapidly, especially the emergence of many high-rise buildings and large workshops. The traditional cables used as power transmission wires can no longer meet the requirements in large current transmission systems. The parallel use of multiple cables brings a lot of inconvenience to the site installation and construction connection

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0026] 1. A bus duct assembly manufacturing process, characterized in that it includes the following steps:

[0027] a. The copper bars in the busway are ready, first cut the length and size of the copper bars;

[0028] b. The copper bars of the standard length are punched with connection holes at both ends;

[0029] c. As mentioned above, the copper bars that need to be welded should be welded first, and then the safety list should be cut, and finally the copper bar connection holes should be punched. If the copper bars are punched with burrs, the burrs should be dealt with first, and then brushed and plated;

[0030] d. The length of the brush-plating copper row of the busway is 15cm;

[0031] e. The length of the sleeve of the heat-shrinkable tube to be prepared is, for example, a copper bar of 3 meters, the length of the sleeve is 2.95 cm, and the length of the sleeve of the heat-shrinkable tube is 2.5 to 3.8 cm;

[0032] f. Cut the two ends of the heat-shrinkable tube t...

Embodiment 2

[0040] 1. A bus duct assembly manufacturing process, characterized in that it includes the following steps:

[0041] a. The copper bars in the busway are ready, first cut the length and size of the copper bars;

[0042] b. The copper bars of the standard length are punched with connection holes at both ends;

[0043] c. As mentioned above, the copper bars that need to be welded should be welded first, and then the safety list should be cut, and finally the copper bar connection holes should be punched. If the copper bars are punched with burrs, the burrs should be dealt with first, and then brushed and plated;

[0044] d. The length of the brush-plating copper row of the bus duct is 12cm;

[0045] e. The length of the sleeve of the heat-shrinkable tube is such as 3 meters of copper bar, the length of the sleeve is 2.95cm, and the length of the sleeve of the heat-shrinkable tube is 2.5cm;

[0046] f. Cut the two ends of the heat-shrinkable tube to 6cm after heat-shrinking, an...

Embodiment 3

[0054] 1. A bus duct assembly manufacturing process, characterized in that it includes the following steps:

[0055] a. The copper bars in the busway are ready, first cut the length and size of the copper bars;

[0056] b. The copper bars of the standard length are punched with connection holes at both ends;

[0057] c. As mentioned above, the copper bars that need to be welded should be welded first, and then the safety list should be cut, and finally the copper bar connection holes should be punched. If the copper bars are punched with burrs, the burrs should be dealt with first, and then brushed and plated;

[0058] d. The length of the brush-plating copper row of the busway is 13cm;

[0059]e. The length of the sleeve of the heat-shrinkable tube to be prepared is, for example, a copper bar of 3 meters, the length of the sleeve is 2.95 cm, and the length of the sleeve of the heat-shrinkable tube is 3.3 cm;

[0060] f. Cut the two ends of the heat-shrinkable tube to 7cm af...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a bus duct assembling manufacturing flow process which comprises the following steps: preparing copper bars in a bus duct, and trimming the length of the copper bars according to the dimensions in a list; punching connection holes at the two ends of the standard-length copper bars respectively; welding the copper bars needing welding; brush plating length of the copper bars in the bus duct being 12-15 cm; preparing a heat shrink tube sleeve pipe, and copper bars, the length of which is 3 m for example, and cutting 2.95 cm of the length of the sleeve pipe; after the thermal shrinkage, cutting the two ends of a heat shrink tube by 6-8 cm; cutting the 1.2-1.3 cm place of the heat shrink tube; during side plate assembling, the piece with a housing being connected with a screw; during bus assembling, preparing copper bars 1-4 cm long and 2-3 cm housing, and cutting the two ends of the bus to enable the copper wires to be exposed for 14-16 cm; and the copper bars in the bus duct being 40-170 cm wide and the side plate being configured to be 90-190 cm wide. The bus duct is convenient to use; and the plug-in type bus duct branches the power source of a trunk line to a branch line by utilizing a plug-in manner, so that convenient branching is achieved.

Description

technical field [0001] The invention relates to a bus duct, in particular to a process for assembling and manufacturing a bus duct. Background technique [0002] Busway is a new circuit method called "Bus-Way-System" developed by the United States. It uses copper or aluminum as a conductor, supports it with non-olefinic insulation, and then installs it in a metal groove. conductor. The real practical application in Japan was in Showa 29 (that is, 1954), and the busway has been developed since then. Nowadays, it has become an indispensable wiring method in high-rise buildings, factories and other electrical equipment and power systems. Due to the needs of various buildings such as buildings and factories, and this demand is increasing year by year, the original circuit wiring method is used. , that is, the way of passing through pipes, which brings many difficulties during construction. Moreover, when it is necessary to change the power distribution system, it is almost imp...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): H02G1/00H02G5/06
Inventor 张贤
Owner JIANGSU HAIWEI GROUP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products