A long-term improvement method for original soil of salt spots in arid area farmland
A technology for arid areas and salt spots, which is applied in the field of long-term improvement of original soil in arid areas of farmland salt spots, can solve the problems of lack of optimization and integration measures, and achieve the effects of easy operation for farmers, blocking capillary action, and not easy to return to salt
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0022] The implementation period is October 25, 2009. The implementation plot is the salt spot at the intersection of Lantian 4th Road and Baiyun 3rd Road in Karamay Agricultural Development Zone. %, the specific operation is as follows:
[0023] a. Landfill gravel layer:
[0024] Choose autumn construction, use an excavator to dig out the salt patch 60cm deep soil, fill 3 layers of gravel with a thickness of 20cm. flat;
[0025] b. Ditching and filling filter material:
[0026] On the salt patch land after step a is flattened, use ditching machine every 5 meters to ditch along the sowing direction, ditch depth 40cm, wide 40cm, in the ditch, fill successively from bottom to top with deep gravel 3 of 10cm and deep crushed straw 2 of 30cm, The length of the crushed straw 2 is 6cm, and the 3 layers of buried gravel are connected with the 3 layers of gravel in step a. The same method is adopted for land preparation, and the salt spot area is marked, and then the planting method...
Embodiment 2
[0030] The implementation period is November 10, 2010. The land for implementation is the newly reclaimed wasteland in Xiaoguai Township, Karamay. The salt spot is roughly within 50m×40m, and the total salt content of the 0-30cm soil layer is 1.26%. The specific operation is carried out according to the following steps:
[0031] a. Filling gravel layer
[0032] Choose autumn construction, use an excavator to dig out the 60cm deep soil in the salt patch, fill 3 layers of gravel with a thickness of 20cm. soil, leveling;
[0033] b. Ditching and filling filter material
[0034] On the salt patch land after step a is flattened, use ditching machine every 10 meters along sowing to ditch, ditch deep 40cm, wide 40cm, in the ditch fill successively from bottom to top the deep gravel 3 of 10cm and the deep pulverized straw 2 of 30cm, The 3rd layer of gravel is connected with the 3rd layer of gravel in step a, the length of crushed straw 2 is 10cm, mark the flat land and salt spot are...
PUM
Property | Measurement | Unit |
---|---|---|
Diameter | aaaaa | aaaaa |
Diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information

- Generate Ideas
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com