A tin bronze and coiled tube technology is applied in the field of preparation of tin bronze coiled tubes, which can solve the problems of low material utilization rate, long process flow and high production cost, and achieve the effects of high comprehensive utilization rate, reduced energy consumption and cost saving.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0029] A preparation method of tin bronze coiled pipe, comprising the following steps:
[0030] (a) Dry the raw materials of the tin-bronze alloy, put them in a smelting furnace according to the mass ratio of 6% tin, 0.1% phosphorus, 0.01% cerium and the remaining copper, set the melting temperature to 1240°C, and wait for the raw materials to melt The back surface is covered with charcoal, and the thickness of the charcoal is 10cm;
[0031] (b) The channel between the melting furnace and the holding furnace is opened, and the molten alloy liquid flows from the melting furnace to the holding furnace;
[0032] (c) cooling the slab, and the cooling slab crystallizer is also equipped with an ultrasonic vibration device;
[0033] (e) Milling the pulled copper tube billet, the double-sided milling method can be adopted;
[0034] (f) Enter the billet into the rolling mill, and the rolls used are three-roll planetary rolling;
[0035] (g) drawing the rolled copper pipe;
[0036] ...
Embodiment 2
[0043] A preparation method of tin bronze coiled pipe, comprising the following steps:
[0044] (a) Dry the raw materials of the tin-bronze alloy, place the combination of tin 6.6%, phosphorus 0.2%, cerium 0.05% and the balance copper in the smelting furnace according to the mass ratio, set the smelting temperature to 1260°C, and wait for the raw materials to melt The back surface is covered with charcoal, and the thickness of the charcoal is 12cm;
[0045] (b) The channel between the melting furnace and the holding furnace is opened, and the molten alloy liquid flows from the melting furnace to the holding furnace;
[0046] (c) cooling the slab, the slab crystallizer is equipped with an ultrasonic vibration device;
[0047] (e) Milling the pulled copper tube billet, the double-sided milling method can be adopted;
[0048] (f) Enter the billet into the rolling mill, and the rolls used are three-roll planetary rolling;
[0049] (g) pulling the rolled copper pipe;
[0050] (...
Embodiment 3
[0053] A preparation method of tin bronze coiled pipe, comprising the following steps:
[0054] (a) Dry the raw materials of the tin-bronze alloy, place the combination of 7% tin, 0.25% phosphorus, 0.1% cerium and the remainder copper in a melting furnace according to the mass ratio, set the melting temperature to 1300°C, and wait for the raw materials to melt The back surface is covered with charcoal, and the thickness of the charcoal is 15cm;
[0055] (b) The channel between the melting furnace and the holding furnace is opened, and the molten alloy liquid flows from the melting furnace to the holding furnace;
[0056] (c) Cooling the billet, the mold of the billet adopts liquid flow multi-hole shunting built-in solid carbon rod graphite lined crystallizer, which can produce copper tubes with different apertures according to needs;
[0057] (e) Milling the pulled copper tube billet, the double-sided milling method can be adopted;
[0058] (f) Enter the billet into the roll...
PUM
| Property | Measurement | Unit |
|---|---|---|
| thickness | aaaaa | aaaaa |
| thickness | aaaaa | aaaaa |
| thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More