Improved method for construction of reserved slot at downstream dam surface for cooling pipe installation
A technology of reserved grooves and cooling water pipes behind the dam, applied in infrastructure engineering, construction, etc., can solve the problems of labor-intensive and metal supports, complex support components, and blind areas of vibration, so as to reduce the workload of high-altitude operations, Reduce quality hidden dangers and ensure the effect of construction quality
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0023] The implementation of the present invention will be described in detail below in conjunction with the accompanying drawings, but they do not constitute a limitation of the present invention, but are only examples; at the same time, the advantages of the present invention will become clearer and easier to understand through description.
[0024] With reference to the accompanying drawings, it can be seen that: 1. the construction method of reserved groove behind the improved cooling water pipe dam of the present invention is characterized in that: its concrete construction steps are:
[0025] ①. After the installation of the template 5 downstream of the pouring warehouse is completed, bind the geotextile 2 at the exposed end of the cooling water pipe 1, and then apply the concrete separation material on the geotextile 2, and let the exposed end of the cooling water pipe 1 cling to the template 5;
[0026] ②. After the downstream template 5 is removed, the geotextile 2 at ...