[0003] 1. The overall structure of the main engine of the drilling rig is complex, which is not easy to install; the reliability is low, and the maintenance workload is heavy, which affects the work efficiency; work efficiency;
[0004] 2. The structure of the limit mechanism of the power head of the drilling rig is too complicated. The power head is limited on the guide rail of the frame through the supporting plate. At the same time, there are intermediate seats, copper plates and other parts between the supporting plate and the guide rail. The weight of the drilling rig affects the positioning accuracy of the drilling and reduces the drilling efficiency of the drilling rig; the guide rail structure is a U-shaped channel steel opening to the right, which is symmetrically arranged on the frame. The disadvantage of this structure is that during use It is prone to elastic deformation, which makes the guiding accuracy worse, increases the vibration of the drilling rig, and even causes the breakage of the drill pipe, causing accidents and affecting the work efficiency;
[0005] 3. The drilling rig completes the drilling task through the cooperative work of the propulsion cylinder and the power head. The piston rod of the propulsion cylinder is fixed on the supporting plate, and the hydraulic thrust acts on the drill pipe through the supporting plate. This structure results in the distance between the hydraulic thrust and the drilling resistance If it is too large, a large force couple will act on the supporting plate, resulting in elastic bending deformation of the supporting plate, which will affect the guiding accuracy of the power head and even break the drill pipe; the structure of the power transmission mechanism of the drilling rig is complicated, and the power input shaft It is connected to the slip hollow shaft through the key, and the slip hollow shaft transmits the power to the drill pipe in the slip hollow shaft through the slips, the power transmission efficiency is low, and the length of the whole machine is long;
[0006] 4. The full hydraulic clamping mechanism of the slips has a complex structure and high sealing requirements. In actual work, the sealing ring is prone to failure under the strong vibration of the drilling process, so that the clamping force on the drill pipe becomes smaller; moreover, The clamping slips are not lubricated and exposed. When the drilling rig is operating at an elevation angle, impurities such as mud and coal powder will be stuck in the moving groove of the slips, making it difficult to clamp and loosen the drill pipe and affect work efficiency;
[0007] 5. The slips are a completely closed structure. Inside the slips, the output shaft of the power head transmits the power from the power head to the drill pipe through a rigid threaded connection. During the drilling process, how much damage will occur due to improper operation or geological changes? The torque causes the threaded connection to be glued, making it difficult to disassemble the drill pipe, and even the output shaft is twisted at the threaded connection, and it is difficult to remove it stuck inside the slip;
[0008] 6. Due to the high-speed rotation and radial vibration of the water braided shaft, the sealing ring between the shell and the water braided shaft is often worn or crushed. The service life of the sealing ring is short and it needs to be replaced frequently. If the replacement is not timely, it will cause Water leaks, and it is easy to cause damage to the water braided shaft. After the water braided shaft is damaged, it is troublesome to replace and the cost is high. The replacement of the sealing ring and the water braided shaft will affect the construction progress and affect the user's safe production.
[0009] 7. The hydraulic clamp is composed of three steel plates arranged in an equilateral triangle and welded together. In order to ensure the accuracy of drilling, the three steel plates must be strictly 60° to each other, but it is difficult to guarantee in the actual welding process; Moreover, since the entire bracket is a welded structure, long-term vibration and hydraulic reaction force will cause cracks at the weld; in addition, affected by the welding bracket, the position of the guide hole of the cover plate fixed on the bracket will change; under the action of the above factors, The slip center of the gripper is inconsistent with the center of the drilling rig power head, and the added drill pipe is inconsistent with the center of the drill pipe clamped by the gripper, resulting in difficulty in centering, damage to the threaded connection between the drill pipes, and increased vibration of the drilling rig , and even break the drill pipe