A technology of modified asphalt and deoiled asphalt, applied in building components, building insulation materials, construction and other directions, can solve the problems of unstable properties, poor compatibility, uneven road asphalt, etc., and achieves simple preparation process, low cost, The effect of excellent high and low temperature performance and fatigue resistance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0025] A kind of preparation method of modified asphalt, this modified asphalt is made up of each material of following parts by weight:
[0026] 100 parts of Zhonghai No. 50 asphalt, 80 parts of propane deoiled asphalt, 3 parts of styrene-butadiene-styrene block copolymer (SBS), 1.5 parts of polyethylene (PE), 1 part of dioctyl phthalate and sulfur 0.1 part;
[0027] Its preparation method concrete operation is:
[0028] (1) After heating Zhonghai No. 50 asphalt to 170-175°C in advance, add propane deoiled asphalt and stir well;
[0029] (2) Add SBS, PE and dioctyl phthalate, stir and swell for 10 minutes;
[0030] (3) Add sulfur at last, and then use a high-speed shearing machine to shear for 40 minutes at a shear rate of 5000 r / min. After shearing, continue stirring and developing for 2 hours to obtain the modified asphalt of the present invention.
Embodiment 2
[0032] A kind of preparation method of modified asphalt, this modified asphalt is made up of each material of following parts by weight:
[0033] 100 parts of Zhonghai No. 70 asphalt, 80 parts of propane deoiled asphalt, 2 parts of styrene-butadiene-styrene block copolymer (SBS), 2 parts of styrene-isoprene-styrene block copolymer (SIS) 2 parts, polyethylene (PE) 1.5 parts, dioctyl phthalate 1 part and sulfur 0.1 part;
[0034] Its preparation method concrete operation is:
[0035] (1) After heating Zhonghai No. 70 asphalt to 170-175°C in advance, add propane deoiled asphalt and stir well;
[0036] (2) Add SBS, SIS, PE and dioctyl phthalate, stir and swell for 15 minutes;
[0037] (3) Add sulfur at last, and then use a high-speed shearing machine to shear for 40 minutes at a shear rate of 6000 r / min. After shearing, continue stirring and developing for 2 hours to obtain the modified asphalt of the present invention.
Embodiment 3
[0039] A kind of preparation method of modified asphalt, this modified asphalt is made up of each material of following parts by weight:
[0040] 100 parts of SK70 asphalt, 90 parts of butane deoiled asphalt, 4 parts of styrene-isoprene-styrene block copolymer (SIS), 1 part of ethylene-vinyl acetate copolymer (EVA), phthalate 1 part of dimethyl formate and 0.15 part of sulfur;
[0041] Its preparation method concrete operation is:
[0042] (1) After heating SK70 asphalt to 175-180°C in advance, add butane deoiled asphalt and stir well;
[0043] (2) Add SIS, EVA and dimethyl phthalate, stir and swell for 15 minutes;
[0044] (3) Add sulfur at last, and then use a high-speed shearing machine to shear for 60 minutes at a shear rate of 7000 r / min. After shearing, continue stirring and developing for 2.5 hours to obtain the modified asphalt of the present invention.
PUM

Abstract
Description
Claims
Application Information

- R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com