Shallow-buried large-span rock tunnel portal section weak blasting excavation construction method
A construction method and large-span technology, applied in tunnels, earthwork drilling, mining equipment, etc., can solve the problems of high cost and low efficiency, and achieve the effect of reducing noise, improving efficiency, and simple construction steps
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0040] Such as figure 1 A weak blasting excavation construction method for the entrance section of a shallow-buried large-span rock tunnel is shown. The tunnel entrance section of the constructed rock tunnel is excavated from the back to the front by using the upper and lower steps method. The tunnel section of the tunnel entrance section is divided into For the upper and lower excavation sections, see figure 2 ; When the tunnel entrance section is excavated, the process is as follows:
[0041] Step 1. Excavation of the upper steps and initial support construction of the upper part: along the longitudinal extension direction of the rock tunnel to be constructed, the upper soil mass of the tunnel entrance section is excavated from the back to the front, and the excavation process is carried out from the back to the front Carrying out initial support to the upper part of the tunnel hole of the excavated tunnel opening section;
[0042] Wherein, when excavating the upper soil ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com