Constructing and building method for non-suitable-for-forestry new diked tidal flat coast protection forest backbone shelterbelt
A technology of basal forest belt and shelter forest, which is applied in the field of agricultural cultivation, can solve the problems of inability to afforestation in newly reclaimed tidal flats along the coast, and achieve the effects of being conducive to large-scale popularization and application, reducing land preparation costs and increasing tending costs.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0034] A method for constructing and constructing the basic trunk forest belt of coastal protection forests in the newly reclaimed tidal flats that are not suitable for forests. Excavation of the main river channel in the newly reclaimed tidal flats, construction of sluice gates, construction of road traffic and drainage systems for sea ponds, and excavation of soil 1 year in advance with a grab machine Digging and turning the soil, the interval is 3 months, 4 times of digging and turning the soil, and piled high piers, the height of the high pier is 40cm planting piers, the bottom diameter is 150cm; in May, excavation, turning and pile When building the mound, sow the Tianqing seeds according to the calculation of 4kg / mu. Before the Tianqing fruits mature, the Tianqing fruits will be buried deeply; in the new reclamation area, plant Eucalyptus grandis, Eucalyptus eucalyptus, Eucalyptus dunne, Casuarina equisetifolia, bamboo willow, etc. Arbor as the base tree species, with olea...
Embodiment 2
[0037] A method for constructing and constructing the basic trunk forest belt of coastal protection forests in the newly reclaimed tidal flats that are not suitable for forests. Excavation of the main river channel in the newly reclaimed tidal flats, construction of sluice gates, construction of road traffic and drainage systems for sea ponds, and excavation of soil 1 year in advance with a grab machine Digging, digging and turning the soil are carried out 3 times at an interval of 4 months, and high piers are piled up. The height of the high piers is 50cm for planting piers and the bottom diameter is 180cm; 4.2kg / mu is calculated to sown Tianqing seeds, and the Tianqing fruits will be buried deep before the Tianqing fruits are mature; in the new reclamation area, plant casuarina, grandis, eucalyptus, dunne and other saline-tolerant trees as the base tone tree species. Saline-alkali-tolerant flowers and trees, such as Taber, Chongyang wood, oleander, Hibiscus sylvestris, Tamarix...
PUM
Property | Measurement | Unit |
---|---|---|
Height | aaaaa | aaaaa |
Bottom diameter | aaaaa | aaaaa |
Bottom diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com