Preparation method for cement water-reducing agent
A water-reducing agent and cement technology, which is applied in the field of preparation of cement water-reducing agent, can solve the problems of complex production process, low production efficiency, difficult implementation of technological process, etc., so as to overcome many processes, improve work efficiency, and improve single-pass conversion. rate and the effect of product yield
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment
[0013] The preparation method of the cement water reducing agent of the present embodiment may further comprise the steps:
[0014] (1) Sulfonation: first add phenanthrene slag into the reaction kettle according to the proportion of ingredients, heat up the temperature, start stirring after the phenanthrene slag melts, slowly add concentrated sulfuric acid within 40 minutes at 100°C, and then maintain the reaction temperature at 130°C, The sulfonation reaction was 3 hours, and the sulfonation was completed;
[0015] (2) Hydrolysis and then sulfonation: cool down to 100°C, add water at a molar ratio of Phoebe water of 1:3.22, hydrolyze for 40 minutes, then heat up to 155°C, and then sulfonate for 40 minutes;
[0016] (3) Condensation: After resulfonation, cool down to 80°C, within 50 minutes, slowly add formaldehyde solution with a mass percentage of 37%, in order to make the condensation reaction mild and prevent implosion, in the formaldehyde solution The ratio is 1:14.6, an...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More