Fissure-contained rock soil stratum prestressed anchor cable grouting and anchoring construction method

A technology of prestressed anchor cables and construction methods, applied in excavation, foundation structure engineering, sheet pile walls, etc., can solve the problems of difficult construction, high cost, no review, etc., and achieve low construction cost, simple processing and production, The effect of simple method steps

Active Publication Date: 2017-03-22
CHINA RAILWAY FIRST GRP CO LTD +1
View PDF5 Cites 11 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In actual construction, the above two reinforcement methods can effectively squeeze out water and air and have the advantages of rust resistance and durability, but the scope of application is narrow, and they are only suitable for soft rock or soil formations, and the above two reinforcement methods have the following five Insufficient aspects: ① Did not check complex geological conditions and find out the development of fractures in strata at different stages; ② Cannot completely remove the water and sand in the cave; Pressure grouting, the s

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Fissure-contained rock soil stratum prestressed anchor cable grouting and anchoring construction method
  • Fissure-contained rock soil stratum prestressed anchor cable grouting and anchoring construction method
  • Fissure-contained rock soil stratum prestressed anchor cable grouting and anchoring construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0055] Such as figure 1 The shown construction method for grouting and anchoring prestressed anchor cables in a cracked rock soil layer adopts a plurality of prestressed anchor cables 2 evenly arranged on the same plane to reinforce the slope 1 to be reinforced. The structure and size of the cables 2 are the same and they are laid from left to right along the length of the slope 1 to be reinforced. The distance between two adjacent prestressed anchor cables 2 is 2.5m~3.5m, see details Picture 1-1 The inclination angle A of the prestressed anchor cable 2 is 18°-22°, and the inclination angle A is the angle between the prestressed anchor cable 2 and the horizontal plane; a plurality of the prestressed anchor cables 2 are used to strengthen the slope 1 When strengthening, include the following steps:

[0056] Step 1. Determine the degree of development of joints and fissures in each rock layer: According to the geological survey report of slope 1 to be reinforced, determine the degr...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

PropertyMeasurementUnit
Lengthaaaaaaaaaa
Lengthaaaaaaaaaa
Login to view more

Abstract

The invention discloses a fissure-contained rock soil stratum prestressed anchor cable grouting and anchoring construction method. Multiple prestressed anchor cables uniformly distributed on the same one plane are adopted to reinforce a slope to be reinforced; the method comprises the following steps: (1) the rock mass joint fissure development degree of each rock stratum is determined; (2) the lengths of anchoring sections and the hole port positions of anchor cable holes are determined; the prestressed anchor cables include anchor cable bodies, primary grouting pipes and secondary grouting pipes; anchoring tools are mounted at the back ends of the anchor cable bodies; and the anchor cable bodies include multiple steel strands; and (3) the prestressed anchor cables are grouted and anchored: when any one prestressed anchor cable is grouted and anchored, the construction includes the steps of drilling, placement of the anchor cables, normal-pressure grouting, high-pressure grouting, tensioning of the anchor cables and anchor sealing. The method is simple in steps, reasonable in design, convenient to construct, high in construction efficiency and excellent in use effect, and can conveniently and quickly finish the reinforcing process of the slope to be reinforced; and the adopted prestressed anchor cables are low in cost and higher in anchoring force, and can effectively reinforce the slope to be reinforced.

Description

Technical field [0001] The invention belongs to the technical field of rock-soil stratum reinforcement construction, and particularly relates to a construction method for grouting and anchoring a pre-stressed anchor cable in a rock-soil layer containing fractures. Background technique [0002] Fractured rocky soil layers refer to rocky soil layers with fissures, and fissures refer to rock mass joint fissures. Therefore, fractured rocky soil layers mainly refer to fractured rock layers, such as karst fractured stratum, weathered rock layer, etc. For rock and soil layers, two grouting methods, namely "mortar pump sealing grouting method" and "secondary split grouting method" are usually used for reinforcement. Among them, the "mortar pump sealing grouting method" refers to the installation of a grouting pipe for the orifice after sealing the orifice of the anchor cable with quick-setting cement. One end of the orifice grouting pipe extends into the orifice, and the other end is con...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E02D17/20E02D5/76
CPCE02D5/76E02D17/20E02D2250/003
Inventor 杨综伟宋再荣魏瑞芳马茂恩张奉超刘金果吴战杰李保群郗宜君杨东雷张伟屈新升田敏峰
Owner CHINA RAILWAY FIRST GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products