Pavement coating material and pavement coating
A technology of cladding materials and raw materials, which is applied in the field of pavement cladding materials and pavement cladding, and can solve the problem of large interlayer internal stress between surface material and substrate deformation, easy arching and deformation of epoxy pavement, and difference in thermal expansion coefficient Larger problems, to achieve the effect of not easy to arch deformation, reduce internal stress, not easy to fall off
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
preparation example Construction
[0039] The preparation method of the above-mentioned pavement cladding material can be obtained by mixing the epoxy resin component and the fine aggregate component.
[0040] The pavement coating of the present invention is formed by coating or spreading the above-mentioned pavement coating on the road surface.
[0041] Here, the thickness of coating or spraying can be referred to as 5-7 mm. The pavement inside can be concrete pavement.
[0042] What is not mentioned above is applicable to the prior art.
Embodiment 1
[0044] Step 1. Perform surface treatment on the original cement concrete pavement base, repair all holes and defects in the surface layer, and ensure that the concrete base is in a dry state.
[0045] Step 2. Before the cladding pavement, use the roughening machine to roughen the concrete surface to increase the specific surface area of the road surface and enhance the adhesion between the epoxy coating and the cement concrete pavement. After the roughening treatment, use adhesive tape to seal all bridge decks Deformation joints, the deformation joints shall not be covered with epoxy coating.
[0046] Step 3, preparation of pavement cladding material. First, the epoxy resin component (including epoxy resin and diluent with a mass ratio of 1:1) and the curing agent component contain the curing agent and diluent with a mass ratio of 1:1 according to the mass ratio of 1:1. The agent is stirred in a high-speed dispersing mixer, and the stirrer is stirred at a low speed of 400-6...
Embodiment 2
[0049] Step 1. Surface treatment is carried out on the base surface of the original cement concrete pavement, and all holes and defects of the base surface are repaired to ensure that the concrete base surface is in a dry state.
[0050] Step 2. Before the cladding pavement, use the roughening machine to roughen the concrete surface to increase the specific surface area of the road surface and enhance the adhesion between the epoxy coating and the cement concrete pavement. After the roughening treatment, use adhesive tape to seal all bridge decks Deformation joints, the deformation joints shall not be covered with epoxy coating.
[0051] Step 3, preparation of pavement cladding material. First, the epoxy resin component (including epoxy resin and diluent with a mass ratio of 1:1.2) and the curing agent component contain the curing agent and diluent with a mass ratio of 1:1.2 according to the mass ratio of 1:1.2 The agent is stirred in a high-speed dispersing mixer, and the ...
PUM
| Property | Measurement | Unit |
|---|---|---|
| particle diameter | aaaaa | aaaaa |
| thickness | aaaaa | aaaaa |
| thermal resistance | aaaaa | aaaaa |
Abstract
Description
Claims