Winding system for circular stirrups in in reinforcement cages in modern prefabricated construction engineering
A technology for construction engineering and reinforcement cages, which is applied in the field of circular stirrup winding and forming systems for reinforcement cages in modern prefabricated construction projects, can solve the problems of low efficiency, time-consuming and labor-intensive, and high labor intensity, and achieve the effect of improving efficiency.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0032] The present invention will be further described below in conjunction with the embodiments and accompanying drawings.
[0033] Such as Figure 1 to Figure 10 As shown, a modern prefabricated building engineering reinforcement cage circular stirrup winding molding system includes a base on which two winding supports c1 are arranged opposite to each other, and the two winding supports A bobbin assembly a is installed between c1, and a synchronizer b is provided on the base close to the bobbin assembly a;
[0034] The barrel winding assembly a includes a barrel a1, the barrel a1 is pierced with a barrel shaft a5, and the two ends of the barrel shaft a5 are respectively movably connected with the two winding supports c1. The cylinder wall of the body a1 is provided with a strip-shaped cutout a2, the length direction of the strip-shaped cutout a2 is parallel to the core line of the cylinder body a1, and an inner cutter a3 is arranged inside the strip-shaped cutout a2 along i...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


