A technology of rolling mill archway and positioning method, which is applied in the field of repair, can solve the problems of high cost, long construction period, and inability to complete repair in a short time, and achieve the effect of short repair time, low repair cost, and guaranteed size and shape tolerance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0045] The present invention will be further described below in conjunction with the embodiment of repairing the wear of the 650 roughing mill archway 1.
[0046] Such as figure 1 As shown, the described matching part 2 is a slide plate, in fact all parts (balance cylinder, balance weight, bending channel fixing seat, base plate, etc.) that cooperate with the archway 1 are all all right.
[0047] Specific steps are as follows:
[0048] 1. Weld 10 M10 fixing nuts 3 on both sides of the skateboard. The welding position of the fixing nuts 3 is kept flush with the fastening bolt holes. Install M10 positioning bolts 5 and lock nuts 6 on each fixing nut 3; The two sides are welded with the positioning parts corresponding to the position of the positioning bolts 5 .
[0049] 2. Use an oxygen-acetylene flame to remove the grease on the surface of the archway 1, use an angle grinder to remove the oxide layer, and then sandblast the surface to obtain a surface above Sa2.5; the surface...
Embodiment 2
[0058] The present invention will be further described below in conjunction with the embodiment of repairing the wear and tear of the 650 finishing mill rolling mill archway.
[0059] Such as figure 2 Shown, described matching part 2 is a slide plate, in fact all parts (balancing cylinder, balance weight, bending and channeling fixing seat, base plate etc.) that cooperate with archway all can.
[0060] Specific steps are as follows:
[0061] 1. First, drill M10X1 threaded holes up and down the fastening bolt holes of the skateboard according to the location of the fastening bolt holes. Each threaded hole is equipped with M10 positioning bolts 5 and lock nuts 6 to achieve positioning purposes;
[0062] 2. Use an oxygen-acetylene flame to remove the grease on the surface of the archway, grind it with an angle grinder to remove the oxide layer, and then sandblast the surface to obtain a surface above Sa2.5; the surface of the sliding plate that matches the archway and all the f...