Natural gas hydrate parallel horizontal well hot-water-injection mining method

A technology for parallel horizontal wells and natural gas, which is applied in the fields of fluid production, earth-moving drilling, wellbore/well components, etc. It can solve the problems of ice blockage of natural gas hydrate decomposition, slow escape velocity, and stagnation.

Inactive Publication Date: 2018-01-12
DALIAN DONGYOU RUIJIA PETROLEUM TECH CO LTD
View PDF5 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, the decomposition driving force provided by the depressurization method alone is small, and the decomposition of natural gas hydrate causes the temperature to drop. When the temperature drops below 0°C, it will also cause ice blockage and stagnation of natural gas hydrate decomposition. CN 20111048906.4 discloses a drainage The natural gas hydrate is exploited by depressurization and heating at the same time, which continuously promotes the decomposition of hydrate. The above two methods use the gas escaping after the hydrate is decomposed, and the water falls due to its own weight. The water pump discharges the water out of the natural gas hydrate production well. But in fact, the decomposed gas carries a large amount of water vapor when it escapes, and

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Natural gas hydrate parallel horizontal well hot-water-injection mining method
  • Natural gas hydrate parallel horizontal well hot-water-injection mining method
  • Natural gas hydrate parallel horizontal well hot-water-injection mining method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0055] The embodiment of the present invention provides a method for hot water injection exploitation of parallel horizontal wells of natural gas hydrate, the method includes: combining geological data, arranging parallel horizontal well patterns and supporting well completion operations for the target storage, and implementing through horizontal wells after completion The depressurized mining will be carried out until there is no economic benefit. After the depressurized mining, the horizontal well will be fractured, and then the ground supply system and the underground movable electric heating system will be arranged in the water injection well, and hot water will be injected into the natural gas hydrate storage through the water injection well, and Natural gas and produced water are collected from production wells.

[0056] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a natural gas hydrate parallel horizontal well hot-water-injection mining method and belongs to the technical field of natural gas hydrate mining. The method includes the stepsthat in combination with geological data, a parallel horizontal well network is arranged for a target reservoir; matched well-completion operation is performed; after well completion is finished, depressurizing mining is performed through the horizontal wells till no economic benefit exists; after depressurizing mining is finished, fracturing operation is performed on the horizontal wells; then aground supply system and an underground movable electric heating system are arranged at the water injection wells; and hot water is injected into the natural gas hydrate reservoir through the water injection wells, and natural gas and produced water are collected from the producing wells. The natural gas hydrate parallel horizontal well hot-water-injection mining method is suitable for the reservoir which is poor in communication property, rich in storage and low in natural gas hydrate saturability; the reservoir is movably heated through the underground movable electric heating system; and by changing the heating position, heat output power and drainage gas recovery speed, optimal mining of the natural gas hydrate reservoir is achieved, the gas mining efficiency can be improved, and theeconomic benefits are improved.

Description

technical field [0001] A method for exploiting natural gas hydrate by hot water injection in parallel horizontal wells belongs to the technical field of natural gas hydrate exploitation, and in particular relates to a method for exploiting natural gas hydrate by comprehensively utilizing a heating method and a depressurization method. Background technique [0002] Natural gas hydrate (NGH for short) is a non-stoichiometric clathrate compound formed by natural gas and water at a certain low temperature and high pressure, also known as "combustible ice". 1m 3 Natural gas hydrate can contain 164m 3 methane gas and 0.8m 3 of water. "Combustible ice" is a secondary product of natural gas, and its application range is roughly the same as that of natural gas. It is a typical oil substitute. "Combustible ice" is extremely flammable. Under the same conditions, the energy generated by the combustion of "combustible ice" is dozens of times higher than that of coal, oil, and natural...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E21B43/24E21B43/20E21B43/30E21B43/26E21B36/04E21B43/01
Inventor 袁鹏飞张晓丽
Owner DALIAN DONGYOU RUIJIA PETROLEUM TECH CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products