Pile foundation construction method penetrating all-filled type cave

A construction method and full filling technology, which can be used in foundation structure engineering, sheet pile walls, buildings, etc., and can solve problems such as buried drilling, easy-to-collapse holes, and accidents

Active Publication Date: 2018-04-20
CHONGQING CONSTR ENG MUNICIPAL TRAFFIC ENG +1
View PDF8 Cites 28 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Due to this design, different soil layers will be encountered when drilling and hole backfilling, and each layer of soil layer has different soil properties. The core barrel drill, pick bit or core barrel are used to drill continuously. Although the drilling speed of this technology is fast and the efficiency is high, it is easy to collapse the hole if the speed is not controlled in the soft soil layer, and the pile hole will expand and deform when it collides with the hole wall, and the drill hole will also occur. Concrete backfilling after the hole is buried in the casing, if you do not pay attention to the change of the concrete backfilling time and backfill concentration, and the exposed height of the casing will easily cause the casing to float, and it will also easily lead to leakage of the conduit interface, allowing the mud to enter the conduit, and in the concrete The interlayer is formed inside, causing the pile foundation to break, and then repairs occur, which wastes manpower, material and financial resources, and accidents, etc.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Pile foundation construction method penetrating all-filled type cave
  • Pile foundation construction method penetrating all-filled type cave
  • Pile foundation construction method penetrating all-filled type cave

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0053] In order to enable those skilled in the art to better understand, the technical solution of the present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0054] Such as figure 1 , figure 2 , image 3 A pile foundation construction method for crossing a fully filled karst cave is shown, comprising the following steps:

[0055] Step 1. Advanced drilling: For the area where the geological survey reveals the development of karst caves, advanced drilling is carried out before the pile foundation construction and the properties of the bedrock are identified. It is required to check the geological age, layer number, layer bottom elevation, and classification Layer thickness, stratum properties, strength of rock samples, presence or absence of karst caves, size of karst caves, roof thickness of karst caves, and degree of roof fragmentation are described in detail, and a columnar diagram of boreholes, a detailed map of ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to the pile foundation construction technology, in particular to a pile foundation construction method penetrating an all-filled type cave. The method includes the following steps of advanced drilling exploitation, construction preparation, protecting barrel burying, mud pond and sedimentation pond setting, in-place installing of a drilling machine, drilling operation, drilling filling, hole clearing, making and installing of a steel reinforcement cage, underwater concrete pouring, chiseling away of a pile head and pile foundation detection; a percussion drill is used fordrilling a punching hammer, the impacting force of the punching hammer is used for penetrating various soil layers or breaking various rock layers, and the work efficiency is effectively improved; inthe process of penetrating the all-filled type cave by means of impacting hole forming, firstly, bagged clay is adopted for backfilling and is slightly beaten in a lower hammer manner to be extrudedinto the cave, the hole wall surrounding rock stability is improved, and the hole collapse risk is reduced; slabstone and bagged cement are adopted for backfilling, and are heavily beaten in a high hammer manner to be extruded into the cave, and the hole wall stability is further improved. By means of the construction method, the hole forming quality, the hole wall stability and the construction operation efficiency of a pile foundation are improved, and the risks of hole collapse, drill jamming, drill burying, slurry leaking and the like are effectively lowered.

Description

technical field [0001] The invention relates to pile foundation construction technology, in particular to a pile foundation construction method for crossing fully filled karst caves. Background technique [0002] Most of the geomorphic features of karst areas present a large area of ​​clustered peaks and a small number of intermountain basins. The reality of more mountains and less land leads to the construction of cities and towns basically on top of karst basins. Underground of these karst basins, due to the crustal movement and the dissolution of groundwater, a karst development zone composed of karst caves and fissures is often formed in the same direction as the long axis of the basin, with different areas. In the area of ​​karst development zone, ground subsidence occurs frequently, and the phenomenon of air pressure upstroke or suction drilling is common during exploration drilling, and the phenomenon of piercing through karst caves often occurs during foundation pile...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E02D15/06E02D5/46
CPCE02D5/46E02D15/06
Inventor 张志飞杨翔颜立谢永辉江真张庆明陶伟向起来李晓倩
Owner CHONGQING CONSTR ENG MUNICIPAL TRAFFIC ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products