Connecting flange machining technology
A technology for connecting flanges and processing technology, applied in the direction of pipes/pipe joints/fittings, damage protection, coatings, etc., can solve the problems of flanges without fire resistance, short service life, simple structure, etc., to improve mechanical properties and corrosion resistance, long service life and stable operation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0020] The processing technology of the connection flange of the present embodiment comprises the following steps:
[0021] (1) Ingredients: The mass percentage of each component in the connecting flange is: C: 0.02%, Al: 3.12%, Zn: 2.15%, Mn: 0.82%, Cr: 0.01%, Ni: 0.01%, Cu: 1.23 %, Mo: 0.01%, Pd: 0.15%, Pt: 0.06%, Nd: 0.02%, Ce: 0.02%, Eu: 0.11%, Lu: 0.02%, Ag: 0.33%, Ga: 0.01%, Sn: 0.35 %, Zr: 0.02%, Re: 0.02%, Bi: 0.01%, and the balance is Fe;
[0022] (2) Shell mold preparation: make a shell mold consistent with the shape of the connecting flange;
[0023] (3) pouring: smelting the raw materials in step (1), pouring into the shell mold after obtaining the alloy solution, after pouring and molding, wait for the casting to cool to room temperature, carry out demoulding of the broken mold shell, and then cut off the insulation riser of the casting to obtain the casting;
[0024] (iv) Grinding and polishing the casting;
[0025] (5) Electroplating pure aluminum coating on ...
Embodiment 2
[0030] The processing technology of the connection flange of the present embodiment comprises the following steps:
[0031] (1) Ingredients: The mass percentage of each component in the connecting flange is: C: 0.03%, Al: 4.55%, Zn: 2.57%, Mn: 1.35%, Cr: 0.03%, Ni: 0.04%, Cu: 1.46% , Mo: 0.02%, Pd: 0.22%, Pt: 0.08%, Nd: 0.04%, Ce: 0.05%, Eu: 0.12%, Lu: 0.06%, Ag: 0.56%, Ga: 0.03%, Sn: 0.44% , Zr: 0.05%, Re: 0.05%, Bi: 0.04%, and the balance is Fe;
[0032] (2) Shell mold preparation: make a shell mold consistent with the shape of the connecting flange;
[0033] (3) pouring: smelting the raw materials in step (1), pouring into the shell mold after obtaining the alloy solution, after pouring and molding, wait for the casting to cool to room temperature, carry out demoulding of the broken mold shell, and then cut off the insulation riser of the casting to obtain the casting;
[0034] (iv) Grinding and polishing the casting;
[0035] (5) Electroplating pure aluminum coating on ...