A process method and technology for water injection wells, applied in chemical instruments and methods, drilling compositions, earthwork drilling and production, etc., can solve problems such as failure to ensure smooth wellbore, secondary blockage, corrosion, etc., and achieve smooth flow and technological process Safe and good compatibility
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0025] The preparation of embodiment 1 inorganic blocking agent
[0026] Weigh 6 parts of hydrochloric acid, 2 parts of hydrofluoric acid, 0.1 part of drainage aid, 1 part of corrosion inhibitor and 0.1 part of iron ion stabilizer into the reaction kettle, add 60 parts of water and stir, raise the temperature to 37°C, and continue stirring for 15 minutes. Then weigh 0.5 parts of surfactant and add it into the reaction kettle, continue to stir for 15 minutes, and then let it stand to obtain an inorganic plug-removing agent.
Embodiment 2
[0027] The preparation of embodiment 2 inorganic blocking agent
[0028] Weigh 8 parts of hydrochloric acid, 4 parts of hydrofluoric acid, 1 part of drainage aid, 2 parts of corrosion inhibitor and 1 part of iron ion stabilizer into the reaction kettle, add 80 parts of water and stir, raise the temperature to 40°C, and continue stirring for 10 minutes. Then weigh 2 parts of the surfactant and add it into the reaction kettle, continue to stir for 15 minutes, and then let it stand to obtain the inorganic plug-removing agent.
Embodiment 3
[0029] Example 3 Combined and integrated water injection well plugging removal process
[0030] S1: pump the inorganic plug-removing agent prepared in Example 1 into the well, and close the well for 12 hours;
[0031] S2: Use a rotary scraper to scrape to the bottom of the well;
[0032] S3: Utilize the skid-mounted filter well-washing vehicle on the ground to wash the well in a circular manner, and filter the fine particle impurities that disperse and dissolve the scale into the skid-mounted well-washing vehicle;
[0033] S4: Circulating the inorganic plugging remover into the well;
[0034] S5: Open the well for water injection, and use the water injection system to unblock the formation.
[0035] Through the above steps, the scale and other impurities formed on the inner wall of the wellbore during the long-term water injection of the water injection well are removed, the wellbore is kept unblocked, and there is no corrosion.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com