Assembled construction method of shield cutterhead maintenance well with jacking first and then excavation

A technology of shield cutter head and construction method, applied in vertical shaft equipment, earthwork drilling, wellbore lining and other directions, can solve the problems of low construction efficiency, narrow operation space, injury to operators, etc., to ensure construction safety, The effect of reducing backfill workload and increasing construction speed

Active Publication Date: 2020-04-07
北京中地盾构工程技术研究院有限公司
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, in the current shield cutter head maintenance well, after excavation, the shaft wall is formed by concrete pouring. After the shield cutter head is repaired, when the maintenance well is ready to be backfilled, the concrete shaft wall is relatively strong and cannot be removed from the ground. To recycle the concrete well wall, it has to be left in the land, and the soil in the maintenance well is backfilled. The problem caused by this is: because the concrete well wall remains in the land, it will have an adverse effect on the construction of other subsequent projects, which is not only poor in environmental protection but also Low construction efficiency
At the same time, in the current full excavation method, if the soil structure is particularly unsuitable for excavation, if the shield section of the maintenance well is excavated first, it will affect the construction speed of the maintenance well
Moreover, in the construction of maintenance wells with concrete, especially in projects such as urban subways, due to the narrow operating space, complex operating environment, and various types of construction machinery, it is easy to cause injuries to operators and is subject to many nearby risk sources such as dense pipelines. impact, and it is not convenient for safe construction

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Assembled construction method of shield cutterhead maintenance well with jacking first and then excavation
  • Assembled construction method of shield cutterhead maintenance well with jacking first and then excavation
  • Assembled construction method of shield cutterhead maintenance well with jacking first and then excavation

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0028] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the specific content of the present invention. Obviously, the described embodiments are only some of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention. The content not described in detail in the embodiments of the present invention belongs to the prior art known to those skilled in the art.

[0029] like Figures 1 to 5 As shown, the embodiment of the present invention provides an assembled construction method of a shield cutter head maintenance well after jacking first and then excavation, including:

[0030] Construction pretreatment is carried out at the position where the maintenance well is set; preferably, the pretr...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an assembly type construction method of a shield cutter disc overhauling well with a mode of pushing first and excavation second, which comprises the following steps of: pre-treating construction; carrying out excavation at the overhauling well and preparing an assembly type locking wellhead; carrying out stage excavation on the overhauling well, wherein an assembly type support structure is arranged in the overhauling well by layers as the support of the well wall until the top layer of the shield section of the overhauling well is excavated, and then the earthwork isbackfilled to the place 3 meters above the shield machine for the pushing of a shield machine; the shield machine is pushed into the preset position of the overhauling well, and the earth is excavatedto the top layer of the shield section again. Only a semi-ring structure of one side area of the support far away from the shield excavated from the shield section to the bottom of the well, performing shield cutter disc overhauling, the assembled support structure in the overhauling well is disassembled from bottom to top after the shield cutter disc overhauling is finished, and the following backfilling is carried out, the shield machine continues to tunnel after the full backfilling is completed. By adopting the method, the construction speed of the overhauling well is improved, no residueexists in the soil body, no pollution is caused, no influence on other projects is caused, the safety is high, and the construction cost is low.

Description

technical field [0001] The invention relates to the field of maintenance well construction for shield tunneling, in particular to an assembled construction method for a shield cutter head maintenance well that is jacked first and then excavated. Background technique [0002] In the current construction of tunnels and subways, shield tunneling technology is required. In the existing shield construction, it is necessary to overhaul the shield cutterhead during the construction process. Currently, to overhaul the shield cutterhead, it is necessary to set maintenance wells at intervals on the excavated route. However, in the current shield cutter head maintenance well, after excavation, the shaft wall is formed by concrete pouring. After the shield cutter head is repaired, when the maintenance well is ready to be backfilled, the concrete shaft wall is relatively strong and cannot be removed from the ground. To recycle the concrete well wall, it has to be left in the land, and t...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E21D5/11E21D5/06E21D5/04E21D5/12E21D9/08
CPCE21D5/04E21D5/06E21D5/11E21D5/12E21D9/08
Inventor 杨宇友
Owner 北京中地盾构工程技术研究院有限公司
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More