A main beam frame for the roof of a factory building
A technology for main beams and workshops, applied in the directions of girders, joists, trusses, etc., can solve the problems of unsatisfactory main beam frame structure and service life, affecting service life and safety, etc. The effect of improving corrosion resistance and hardness
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0034] A main beam frame for the roof of a factory building and its manufacturing method, characterized in that it includes a first main rod body and a second main rod body, the first main rod body is symmetrically arranged between the first pipe body and the second pipe body, The second main rod body is arranged symmetrically between the second pipe body and the third pipe body. In the cross-section of the main beam frame, the respective circle centers of the two main rod bodies, the first pipe body, the second pipe body and the third pipe body are on the same horizontal line On the upper middle of the first main rod body and the second main rod body, a fourth pipe body and a fifth pipe body are respectively arranged, and the fourth pipe body is connected with the first pipe body and the second pipe body on both sides of the first main rod body at the same time. The pipe body is welded and connected, and the fifth pipe body is welded to the second pipe body and the third pipe ...
Embodiment 2
[0043] A main beam frame for the roof of a factory building and its manufacturing method, characterized in that it includes a first main rod body and a second main rod body, the first main rod body is symmetrically arranged between the first pipe body and the second pipe body, The second main rod body is arranged symmetrically between the second pipe body and the third pipe body. In the cross-section of the main beam frame, the respective circle centers of the two main rod bodies, the first pipe body, the second pipe body and the third pipe body are on the same horizontal line On the upper middle of the first main rod body and the second main rod body, a fourth pipe body and a fifth pipe body are respectively arranged, and the fourth pipe body is connected with the first pipe body and the second pipe body on both sides of the first main rod body at the same time. The pipe body is welded and connected, and the fifth pipe body is welded to the second pipe body and the third pipe ...
Embodiment 3
[0052] A main beam frame for the roof of a factory building and its manufacturing method, characterized in that it includes a first main rod body and a second main rod body, the first main rod body is symmetrically arranged between the first pipe body and the second pipe body, The second main rod body is arranged symmetrically between the second pipe body and the third pipe body. In the cross-section of the main beam frame, the respective circle centers of the two main rod bodies, the first pipe body, the second pipe body and the third pipe body are on the same horizontal line On the upper middle of the first main rod body and the second main rod body, a fourth pipe body and a fifth pipe body are respectively arranged, and the fourth pipe body is connected with the first pipe body and the second pipe body on both sides of the first main rod body at the same time. The pipe body is welded and connected, and the fifth pipe body is welded to the second pipe body and the third pipe ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 

