A single-sided formwork and system technology, which is applied in water conservancy projects, formwork/formwork/work frames, and on-site preparation of building components, can solve the problem that the reinforcement system relies on single-sided diagonal braces or opposite braces, and the concrete lateral pressure is large , high construction costs and other issues, to achieve the effect of promoting development and continuously improving the degree of utilization, saving engineering costs and good economic benefits
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0065] The construction method of using the above-mentioned single-side formwork system to pour the external wall, the specific steps are as follows:
[0066] Step 1, the height of the outer wall to be poured is 6500mm, which can be divided into two sections: the formwork system of the initial section and the formwork system of the extension section. The pouring height of the first fastening part is 3500mm; the pouring of the second fastening part The height is 3000mm. Only a second fastening part is required in the formwork system of the extension to be poured to the top of the wall.
[0067] Step 2, prepare materials;
[0068] Step 3, pre-embed the ground anchors 4 in the base plate 3, and set the limit rod 16 at the same time; the ground anchors 4 are arranged at intervals, the longitudinal distance between adjacent ground anchors 4 is 600mm, and the transverse distance between adjacent ground anchors 4 is 1000mm;
[0069] Step 4, set up the first fastening part of the fo...
Embodiment 2
[0075] Embodiment 2, the single-side formwork system and the construction method of using the system to pour the external wall are the same as the embodiment 1, the difference is that the external wall to be poured is 8700mm high and can be divided into three sections, that is, the initial section supports Formwork system and extension support formwork system. There are two second fastening parts in the formwork system of the extension section and can be poured to the top of the wall. The pouring height of the first fastening part is 3500mm; the pouring height of the second fastening part for the first time is 3000mm, and the pouring height of the second fastening part for the second time is 2200mm.
[0076] Such as figure 2 As shown, the construction method of pouring the second fastening part for the second time repeats step seven and step eight. That is, after the pouring height 3000mm of the second fastening part for the first time is poured, the concrete in the second ...