Rubber ring and production method thereof
A technology of rubber rings and rubber rings, which is applied to other household appliances, engine seals, engine components, etc., can solve problems affecting work performance, rubber ring movement, and easy to slip, so as to reduce maintenance and replacement costs and achieve tight connection , enhance the sealing effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037] The preparation method of rubber ring comprises the following steps:
[0038] A. Place the waste rubber material in a smelting furnace for smelting. The temperature in the smelting furnace is 140° C., and the smelting time is 15 minutes;
[0039] B. Put the smelted rubber in the mixing tank, then add the liquid glue, and stir it fully. The stirring time is 20 minutes, the stirring frequency is 20 Hz, and the stirring temperature is 110°C;
[0040] C. Use the upper and lower molds to shape the raw materials that have been stirred in step B. During the shaping process, the upper and lower molds need to ensure that the temperature is at 90°C, and the shaping time is 2 minutes;
[0041] D. After step C is completed, use the circular moving device to move the position of the upper and lower molds so that they pass through the cooling zone and disassembly zone in turn;
[0042]E. Open the upper and lower molds in the disassembly area, and then use the disassembly tool to dis...
Embodiment 2
[0046] The preparation method of rubber ring comprises the following steps:
[0047] A. Place the waste rubber material in a smelting furnace for smelting. The temperature in the smelting furnace is 155° C., and the smelting time is 22 minutes;
[0048] B. Put the smelted rubber in the mixing tank, then add the liquid glue, and stir it fully. The stirring time is 15 minutes, the stirring frequency is 30 Hz, and the stirring temperature is 115 °C;
[0049] C. Use the upper and lower molds to shape the raw materials stirred in step B. During the shaping process, the upper and lower molds need to ensure that the temperature is 100 ° C, and the shaping time is 3 minutes;
[0050] D. After step C is completed, use the circular moving device to move the position of the upper and lower molds so that they pass through the cooling zone and disassembly zone in turn;
[0051] E. Open the upper and lower molds in the disassembly area, and then use the disassembly tool to disassemble the ...
Embodiment 3
[0055] The preparation method of rubber ring comprises the following steps:
[0056] A. Place the waste rubber material in a smelting furnace for smelting, the temperature in the smelting furnace is 180°C, and the smelting time is 30min;
[0057] B. Put the smelted rubber in the mixing tank, then add the liquid glue, and stir it fully. The stirring time is 30 minutes, the stirring frequency is 45 Hz, and the stirring temperature is 130 °C;
[0058] C. Use the upper and lower molds to shape the raw materials stirred in step B. During the shaping process, the upper and lower molds need to ensure that the temperature is 120 ° C, and the shaping time is 5 minutes;
[0059] D. After step C is completed, use the circular moving device to move the position of the upper and lower molds so that they pass through the cooling zone and disassembly zone in turn;
[0060] E. Open the upper and lower molds in the disassembly area, and then use the disassembly tool to disassemble the rubber ...