[0022] A planting method of cress, said planting method may further comprise the steps:
[0023] (1) Deeply plow the field for 25 to 30 cm, remove weeds, rake the mud surface, apply manure to the surface of the planting field, and then loosen the soil of the planting field, blend the manure and soil together, and make the border wide when planting 120-180cm, row the seedlings in rows, every row is 20cm apart, each row is about 5 kinds of celery, and cover with fine soil while discharging;
[0024] (2) Immediately after the celery has been discharged, the soil moisture will be irrigated, and the seedlings will be fully moistened during irrigation, and then the accumulated water in the field will be drained;
[0025] (3) when the seedling is up to 35~40cm, carry out the soil cultivation operation, the soil that adopts in the soil cultivation operation is the soil of compound organic fertilizer and nutrient solution,
[0026] (4) Within 15 days after planting, keep water in the ...
Embodiment 2
[0034] A planting method of cress, said planting method may further comprise the steps:
[0035] (1) Deeply plow the field for 25 to 30 cm, remove weeds, rake the mud surface, apply manure to the surface of the planting field, and then loosen the soil of the planting field, blend the manure and soil together, and make the border wide when planting 120-180cm, row the seedlings in rows, every row is 20cm apart, each row is about 5 kinds of celery, and cover with fine soil while discharging;
[0036] (2) Immediately after the celery has been discharged, the soil moisture will be irrigated, and the seedlings will be fully moistened during irrigation, and then the accumulated water in the field will be drained;
[0037] (3) when the seedling is up to 35~40cm, carry out the soil cultivation operation, the soil that adopts in the soil cultivation operation is the soil of compound organic fertilizer and nutrient solution,
[0038] (4) Within 15 days after planting, keep water in the ...
Embodiment 3
[0046] A planting method of cress, said planting method may further comprise the steps:
[0047] (1) Deeply plow the field for 25 to 30 cm, remove weeds, rake the mud surface, apply manure to the surface of the planting field, and then loosen the soil of the planting field, blend the manure and soil together, and make the border wide when planting 120-180cm, row the seedlings in rows, every row is 20cm apart, each row is about 5 kinds of celery, and cover with fine soil while discharging;
[0048] (2) Immediately after the celery has been discharged, the soil moisture will be irrigated, and the seedlings will be fully moistened during irrigation, and then the accumulated water in the field will be drained;
[0049] (3) when the seedling is up to 35~40cm, carry out the soil cultivation operation, the soil that adopts in the soil cultivation operation is the soil of compound organic fertilizer and nutrient solution,
[0050](4) Within 15 days after planting, keep water in the f...