Model test device and method for foundation pit supporting system
A model test device and foundation pit support technology, which is applied in the testing of foundation structures, foundation structure engineering, construction, etc., can solve problems such as being unsuitable for studying foundation pit support conditions, and achieve low density, high recovery rate, and improved Effects of Test Efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0044] see figure 1 and figure 2 , a model test device for foundation pit support system under freeze-thaw cycle conditions in seasonally frozen regions according to an embodiment of the present invention, comprising a base 1, a model box 2, and a model plate 3, a rigid baffle 4, The front opening and closing rigid baffle 5 , the right opening and closing rigid baffle 6 , tempered glass plate 7 , pole 8 , hoisting system 9 , water supply device 10 and cooling system 11 .
[0045] The base 1 is welded by steel plates and angle steels. The angle steels are connected to each other and form grids. There are spaces between the grids so that the grids are connected to each other. The longitudinal dimension of the base is slightly larger than the bottom of the model box. There are protruding baffles that can hold the model box to prevent the model box from moving during the test. The side steel plate of the base is higher than the bottom of the box, the base can be filled with wat...
Embodiment 2
[0065] The difference between this embodiment and embodiment 1 is that the configured soil with a certain moisture content is filled into the left model box when filling the soil, and no support is applied when filling the soil on the right. Then excavate the left fill soil to the first support position, apply the first support, read; then excavate the left fill soil to the second support position, apply the second support, read; then excavate the left fill When the third support position is reached, the third support is applied and the reading is taken; finally excavated to the bottom of the pit and the reading is taken. Other processes are the same as in Example 1.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com