A construction method for staggered joint assembly of shield segments
A segment assembly and construction method technology, which is applied in vertical shaft equipment, earthwork drilling, wellbore lining, etc., can solve problems such as large construction risks, large segment misalignment, and water leakage
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0055] The specific implementation manners of the present invention will be described in further detail below in conjunction with the accompanying drawings.
[0056] Such as figure 1 Shown, construction method of the present invention specifically comprises the following steps:
[0057] Step 1. Carry out segment selection
[0058] Step 1.1. Segment selection is carried out by combining the machine selection with the segment selection compass as the benchmark. The VMT automatic guidance system set in the main control room of the shield machine is equipped with a segment assembly module, and the segment The assembly module is calculated according to the staggered assembly form, the gap between the shield tail, the length of the oil cylinder, the centerline of the excavation line, and the direction of travel. The segment ring is assembled from 9 arc-shaped segments with a width of 2m and a thickness of 50cm. Among them, A1-type segment to A6-type segment is the standard block w...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 