Built-in type quenching tool for heat treatment pit type furnace and assembling method thereof
An assembly method and pit furnace technology, which are applied in heat treatment furnaces, quenching devices, heat treatment equipment, etc., can solve the problems of inability to install circulating fans, low furnace temperature uniformity, etc., and achieve lower production costs, convenient processing, and simple and fast operation. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0024] Below in conjunction with accompanying drawing, technical scheme of the present invention is described in further detail:
Embodiment 1
[0026] The invention provides a heat treatment pit furnace built-in quenching tool, such as Figure 1-2 As shown; it includes a boom 1-1 with an integrated structure and a disc-shaped hanger 1-2 below the hanger; the top of the disc-shaped hanger is bent radially outward at equal intervals to extend a set of hangers 1-4; the edges of adjacent hangers are sequentially connected to form a closed loop 1-5; the same side and the same position of the hanger are perpendicular to the surface of the hanger and are provided with lifting lugs 1-3; the hanging lugs are hung with shafts The suspension ring for the fixed connection of parts; the suspension seat is located on the load-bearing ring in the well-type furnace. The frock is integrally cast, and the shaft part 5 is welded with the suspension ring 4 and then hung on the frock lifting lug 1-3. Suspender 1-2 is located on the load-bearing ring in the well-type furnace.
[0027] Such as image 3 As shown, the four corner hangers 1...
Embodiment 2
[0034] Such as Figure 5 As shown, the hexagonal suspension 2-2 distributes six lifting lugs 2-3 at equal angles of 60° along the circumference, the lifting ring 4 is hung on the lifting lug 2-3, and the mass G is fixed at the lower part of the lifting ring 4 1 For shaft parts 5 weighing less than 2250 kg, before preheating the shaft parts 5, the number of shaft parts 5 to be installed is manually judged, and the lifting ring 4 is welded on the top of the shaft parts 5. 3 or 6 shaft parts can be hung at the same time, and the 3 shaft parts must be hung symmetrically. The remainder of this embodiment is the same as Embodiment 1.
PUM
| Property | Measurement | Unit |
|---|---|---|
| length | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 