Construction method of spatial mismatch cantilevered terraces of building
A construction method and building technology, applied in building construction, on-site preparation of building components, construction, etc., can solve the problems of high structural quality control and construction safety risks, the inability to dismantle the support frame in advance, and the high construction cost, To achieve the effect of improving construction safety and construction efficiency, improving turnover, and convenient construction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0052] Such as Figure 1-Figure 8 Shown is a construction method for a space-displaced cantilevered terrace of a building. The space-displaced cantilevered terrace includes a plurality of dislocated terrace unit sections arranged sequentially from bottom to top along the height direction of the main body of the building. The dislocated terrace unit sections span N consecutive floors, where N is a positive integer and 2
[0053] In actual use, the staggered terrace unit segment spans 4 consecutive floors, that is, the spatially staggered cantilevered terrace circulates once every four floors, which can meet the lighting requirements of the cantilevered terrace on each floor.
[0054] In this embodiment, during the construction of the spatially dislocated cantilevered terrace, the spatially dislocated cantilevered ...