[0029] A construction technique for colored asphalt pavement, the object of use is motor vehicles, the base surface is new black asphalt concrete, and the area is about 3000 square meters. It mainly includes the following steps:
[0030] Step 1: On the first day, close the traffic and clean the road surface; check the working status of generators, air compressors, small hand-push mixing barrels, small hand-push ultra-fine sprayers, etc.;
[0031] Step 2: Lay out the wires and stick out the edge line with 10-15cm paper tape, determine the construction area, and prepare 2-3 spraying baffles (baffle size: height 1.2m*length 2m) to prevent splashing during spraying and pollute the environment ;
[0032] Step 3: According to the amount of colored asphalt emulsion and mixture per unit area, stack the corresponding raw materials equidistantly, weigh a certain amount of colored asphalt emulsion according to the construction ratio and add it to the small hand-push mixing tank, and the...
specific Embodiment 2
[0037] An ultra-micro-spraying construction process for colored asphalt pavement, the object of use is motor vehicles, the base surface is cement concrete that has just been cured, about 2000 square meters, mainly including the following steps:
[0038]Step 1: On the first day, close the traffic and clean the road surface; check the working status of generators, air compressors, napping machines, small hand-push mixing barrels, small hand-push ultra-fine sprayers, etc.;
[0039] Step 2: Lay out the wires and stick out the edge line with 10-15cm paper tape, determine the construction area, and prepare 2-3 spraying baffles (baffle size: height 1.2m*length 2m) to prevent splashing during spraying and pollute the environment ;
[0040] Step 3: Rafting of the base surface: Since the original road surface is a cement concrete layer, the surface is flat and smooth, and there is almost no structural depth, the cement concrete layer needs to be roughened first (the roughening depth is ...
specific Embodiment 3
[0047] An ultra-micro-spraying construction technology for colored asphalt pavement, the object of use is non-motor vehicles, the base surface is black asphalt concrete, the color is red and green, and the red area is 1500 square meters, and the green area is 400 square meters. It mainly includes the following steps:
[0048] Step 1: On the first day, close the traffic and clean the road surface; check the working status of generators, air compressors, small hand-push mixing tanks, small hand-push ultra-fine sprayers and other equipment;
[0049] Step 2: Lay out the wires and stick out the edge line with 10-15cm paper tape, determine the construction area, and prepare 2-3 spraying baffles (baffle size: height 1.2m*length 2m) to prevent splashing during spraying and pollute the environment ;
[0050] Step 3: On the first day, first complete the coarse-grained spraying of 1500 square meters of red single-layer structure. According to the amount of colored asphalt emulsion and ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com