A construction control method for preventing cold joints in mass concrete pouring
A large-volume concrete and control method technology, applied in construction, infrastructure engineering, etc., can solve problems such as prone to missed judgments and difficult to be comprehensive, and achieve the effect of ensuring construction quality and avoiding subjectivity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0056] During the pouring process of the 38 warehouse of No. 7 dam section in the concrete pouring of a project dam, the concrete layer thickness of the pouring warehouse is 3m, and the pouring volume is 5216.9m 3 , according to the construction plan provided by the design system, the concrete is constructed according to 6 blank layers, and the thickness of each blank layer is 0.5m. The concrete in this warehouse is all entered by cable crane, the initial setting time of concrete is 4 hours, and the pouring strength of each cable crane is 63m 3 / h, considering the operation interference of the cable machine and other factors, the loss coefficient k=0.72, then according to the cable machine configuration formula, the number of cable machines should be configured n=5216.9 / (63*6*4*0.72)=4.79≈5, then the The warehouse surface is divided into 5 strips equally spaced from the upstream to the downstream for pouring, and the concrete entering the warehouse for each strip is responsibl...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 