Welding method for Q460C high-strength steel in extra-high-pressure steel tube tower
A welding method and technology for steel pipe towers, applied in welding equipment, welding accessories, arc welding equipment, etc., can solve the problems of large welding workload and cumbersome operation process, so as to improve welding quality, reduce workload, reduce the number of layers and The effect of the number of tracks
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0029] A method for welding Q460C high-strength steel in an ultra-high pressure steel pipe tower, comprising the following steps:
[0030] (1) Groove form: Q460C steel plate thickness is 10mm, butt welding, V-shaped groove is adopted, the groove angle is 40°, and the gap is 2-3mm;
[0031] (2) Preheat to a temperature of 135°C, and start to vibrate after preheating to a temperature of 100°C, with a vibration acceleration of 10m / s 2 ;
[0032] (3) Welding: Gas shielded welding is used for one-layer welding. The number of weld passes in a single welding layer is 1. The process parameters of gas shielded welding: the gas contains 80% Ar+20% CO 2 , using ER55-G solid welding wire, welding wire diameter 1.2mm, welding current 220A, welding voltage 23V, welding speed 200mm / min, heat input 12KJ / cm, welding and vibration start at the same time, vibration acceleration is 15m / s 2 ;
[0033] After the welding is completed, continue to vibrate for 10 minutes, and the vibration accelera...
Embodiment 2
[0035] A method for welding Q460C high-strength steel in an ultra-high pressure steel pipe tower, comprising the following steps:
[0036] (1) Groove form: Q460C steel plate thickness is 12mm, butt welding, V-shaped groove is adopted, the groove angle is 45°, and the gap is 2-3mm;
[0037] (2) Preheat to a temperature of 150°C, and start to vibrate after preheating to a temperature of 100°C, with a vibration acceleration of 12m / s 2, ;
[0038] (3) Welding: Gas shielded welding is used for welding, and two-layer welding is performed, including a layer of bottom welding layer and a layer of filling and covering welding layer. The number of weld passes in a single welding layer is 1, and the gas contains 80% Ar +20%CO 2 , using ER55-D2-Ti solid wire, wire diameter 1.2mm, welding current 230A, welding voltage 25V, welding speed 250mm / min, heat input 13KJ / cm, welding and vibration start at the same time, vibration acceleration is 20m / s 2 ;
[0039] After the welding is completed,...
Embodiment 3
[0041] A method for welding Q460C high-strength steel in an ultra-high pressure steel pipe tower, comprising the following steps:
[0042] (1) Groove form: Q460C steel plate thickness is 14mm, butt welding, V-shaped groove is adopted, the groove angle is 50°, and the gap is 2-3mm;
[0043] (2) Preheat to a temperature of 165°C, and start to vibrate after preheating to a temperature of 100°C, with a vibration acceleration of 15m / s 2 ;
[0044] (3) Welding: Gas shielded welding is used for welding, and two-layer welding is performed, including a layer of bottom welding layer and a layer of filling and covering welding layer. The number of weld passes in a single welding layer is 1, and the gas contains 80% Ar +20%CO 2 , using ER55-D2-Ti, welding wire diameter 1.2mm, welding current 240A, welding voltage 26V, welding speed 300mm / min, heat input 15KJ / cm, welding and vibration start at the same time, vibration acceleration is 25m / s 2 ;
[0045] After the welding is completed, c...
PUM
| Property | Measurement | Unit |
|---|---|---|
| diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 
