[0028] Subway station construction in the central area of a certain northern city. The subway station is located in the bustling area of the city, and it needs to pass through the main road of the city when it is built. There is a crossing section at the west end of this interval, with many types of sections and frequent transitions; moreover, there are many sudden changes, and the excavation profiles of the sections are greatly different. The adjacent standard section is only 2.3m. The main structure of the interval is mainly located in the medium-coarse sand layer, silt-fine sand layer and pebble-round gravel layer. The soil is disturbed many times during the initial excavation, which will directly affect the settlement of the road and the upper pipeline.
[0029] Therefore, it is finally determined through various schemes that the construction method of crossing the line section of the water-rich sand and pebble stratum of the present invention is excavated and crossed...
Embodiment 2
[0042] The invention relates to a construction method for submerged crossing sections of water-rich sand and pebble strata to cross urban arterial roads. like figure 1 As shown, the method includes the following steps:
[0043] a. Construction preparation, and dewatering construction is required before construction, and the water level is lowered to 0.5-1m below the structural floor. And timely carry out open drainage treatment for the stagnant water between layers to ensure construction safety;
[0044] b. Carry out stratum grouting reinforcement to the strata around the crossing section. After the stratum grouting reinforcement is completed, erect temporary steel supports at the crossing section, and then build an arched pipe shed and perform grouting reinforcement on the pipe shed;
[0045] c. Carry out underground excavation construction for the line crossing section, and use the double-side-wall pilot pit method for excavation of the large section: the excavation first ...
Embodiment 3
[0067] The invention relates to a construction method for submerged crossing sections of water-rich sand and pebble strata to cross urban arterial roads. like figure 1 As shown, the method includes the following steps:
[0068] a. Construction preparation, and dewatering construction is required before construction, and the water level is lowered to 0.5-1m below the structural floor. And timely carry out open drainage treatment for the stagnant water between layers to ensure construction safety;
[0069] b. Carry out stratum grouting reinforcement to the strata around the crossing section. After the stratum grouting reinforcement is completed, erect temporary steel supports at the crossing section, and then build an arched pipe shed and perform grouting reinforcement on the pipe shed;
[0070] c. Carry out underground excavation construction for the line crossing section, and use the double-side-wall pilot pit method for excavation of the large section: the excavation first ...