Construction system and method for combination of horizontal and vertical rotation for circular steel-lined tunnels
A lining and tunnel technology, which is applied in the field of construction system combining horizontal and vertical rotation of circular steel-lined tunnels, can solve the problems of high price, difficult construction and slow construction speed of steel pipe assembly and welding special machines
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0044] see Figure 1-6 , a construction system for the combination of horizontal and vertical rotation of a circular strip steel lined tunnel, which includes a steel lining circle system 1 for assembling three steel lining circles, and a track 6 is laid inside the tunnel, and the track 6 is equipped with a steel lining transport trolley 5 for steel lining 3 transportation by rolling fit, and a steel lining lifting and transportation device 4 for steel lining 3 hoisting and steering is arranged on the top of the tunnel, and a useful The needle beam trolley device is supported by the steel lining 3 for positioning and conveying. The construction system adopting the above-mentioned structure can be used for the lining construction of the circular strip steel-lined tunnel, thereby effectively solving the problems of narrow space and more interference in the construction process of the lining steel bars and the steel lining. For tight spaces, the work efficiency of concrete lining...
Embodiment 2
[0050] Such as Figure 7-10 , the method for the construction of the tunnel lining by the construction system of the circular band steel lined tunnel combined horizontally and vertically, is characterized in that it comprises the following steps:
[0051] Reasonably divide the steel lining into sections and tiles;
[0052] Step 2, complete the processing of system components according to the design requirements;
[0053] Step 3: According to the construction organization arrangement and the operation requirements of the system, rationally plan and set up the outrigger foundation, and install the track 6;
[0054] Step 4, binding concrete lining reinforcement;
[0055] Step five, carry out the steel lining horizontal and horizontal grouping, hoisting and vertical rotation, and assembly construction;
[0056] Step 6, carry out lining concrete construction;
[0057] Step 7, after the concrete strength meets the design requirements, the equipment moves to the next construction...