A method for repairing damaged casing by combined settlement and floating plugging
A repair method and casing technology, which is applied in the direction of drilling composition, chemical instruments and methods, and earthwork drilling and production, and can solve the problems of affecting the plugging effect, high density, and insufficient filling of the upper part of the annulus at the casing damage point, etc. , to improve the plugging effect, apply to a wide range of temperatures, and ensure the integrity of the effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0043] A settlement and floating composite plugging and repair method for damaged casing, aimed at the 5-1 / 2 production casing of an oil well that has been in production for 15 years in an oil field due to corrosion damage (formation fluid outside the damage point, damage depth 1320-1330m, formation temperature At 50°C, the cumulative liquid volume under the pressure test condition of 8MPa is 2.8m 3 , it is required to meet the pressure drop requirement of <0.5MPa for 30 minutes under 15MPa after repair), the specific repair process includes the following steps:
[0044] 1) Lower the packer to 1370m and set;
[0045] 2) Squeeze injection of water-isolation gel 2m in the empty wellbore 3 , settling plugging agent 4m3 , floating plugging agent 4m 3 ;
[0046] 3) Squeeze water 12.7m 3 , be careful not to overcrowd, reserve the plugging agent plug to 30m above the leak point;
[0047] 4) Hold the pressure for 48 hours after the injection is completed;
[0048] 5) Lower the d...
Embodiment 2
[0054] A settlement and floating composite plugging and repair method for damaged casings, aimed at oil wells (9-5 / 8 casings with corrosion and damage, damage depth 1810-1824m, temperature 70°C, formation water salinity 300,000mg) in an oilfield that has been in production for 10 years / L, the cumulative liquid volume under 10MPa is 4.3m 3 , it is required to meet the 30min pressure drop under 20MPa < 0.5MPa after repair), the specific repair process includes the following steps:
[0055] 1) Lower the packer to 1854m and set;
[0056] 2) Squeeze injection of water-isolation gel 2m in the empty wellbore 3 , settling plugging agent 5m 3 , floating plugging agent 5m 3 ;
[0057] 3) Squeeze 65.8m of clean water 3 , be careful not to overcrowd, reserve the plugging agent plug to 30m above the leak point;
[0058] 4) Hold the pressure for 48 hours after the injection is completed;
[0059] 5) Lower the drilling plug tool, drill off the reserved gel plug and packer, circulate ...
PUM
Property | Measurement | Unit |
---|---|---|
density | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com