Oil-layer blasthole plugging agent at low temperature
A plugging agent and oil layer technology, applied in the direction of drilling composition, chemical instruments and methods, etc., can solve the problems of large leakage, poor formation adaptability and poor construction safety, so as to reduce the dosage, improve the success rate of construction, The effect of preventing leakage
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0013] Example 1: Well Bei 1-Ding 4-P62 is a water injection well. The plugging layer of this well is Pu I 1,1, the plugging interval is 1047.8-1051.4m, the thickness of the injection is 3.6m, and the temperature of the reservoir is 42°C. The low-temperature oil layer blast hole plugging agent is a product formulated according to the following weight percentage: the molecular weight is 2300×10 4 17% of polypropylene microfiber; 18% of superfine expansion cement; 45% of tricalcium silicate; 13.8% of 800# Portland cement; 1.2% of industrial calcium sulfate; %. After all the above materials are mixed, grind them so that the particle size is controlled at a 200-mesh sieve and all pass through. The plugging agent was tested indoors at 45°C, the initial setting time was about 3.5 hours, and the complete setting time was about 5.5 hours. Prepare water 3.0m during on-site construction 3 , add 4.2t of blasthole plugging agent, fully stir evenly, and the density of the prepared plug...
Embodiment 2
[0014] Example 2: Well Bei 1-321-P37 is an oil production well. The well is plugged in layer Sa II 14-16, with a plugged well section of 991.9-999.0m, a penetration thickness of 7.1m, and a reservoir temperature of 43°C. The low-temperature oil layer blast hole plugging agent is a product formulated according to the following weight percentage: the molecular weight is 2500×10 4 15% of polypropylene microfiber; 16% of superfine expansion cement; 49% of tricalcium silicate; 14.5% of 800# Portland cement; 1.5% of industrial calcium chloride; Denim 4%. After all the above materials are mixed, grind them so that the particle size is controlled at a 200-mesh sieve and all pass through. The plugging agent was tested indoors at 45°C, the initial setting time was about 3 hours, and the complete setting time was about 5 hours. Prepare 3.5m of water during on-site construction 3 , add 4.9t of blasthole plugging agent, fully stir evenly, and the density of the prepared plugging agent s...
Embodiment 3
[0015] Example 3: Well Bei 1-Ding 5-P141 is a water injection well. The well plugged Pu I 2, the plugged well interval was 1023.5-1028.6m, the thickness of the shot was 5.1m, and the temperature of the reservoir was 42°C. The low-temperature oil layer blast hole plugging agent is a product formulated according to the following weight percentage: the molecular weight is 2400×10 4 17% of polypropylene microfiber; 18% of superfine expansion cement; 45% of tricalcium silicate; 13.8% of 800# Portland cement; 1.2% of industrial calcium sulfate; %. After mixing all the above materials, grind them so that the particle size is controlled at 200 mesh and all the sieves pass through. The plugging agent is tested indoors at 45°C. The initial setting time is about 3.5 hours, and the complete setting time is about 5.5 hours. Prepare water 4.0m during on-site construction 3 , add 5.6t of blasthole plugging agent, fully stir evenly, and the density of the prepared plugging agent suspension...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com