Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Tunnel three-step synchronous excavation construction method based on partition explosion

A construction method and three-step technology, which can be used in blasting, tunnels, tunnel linings, etc., and can solve problems such as deformation and structural damage of the primary arch frame, collapse of the upper soil layer, and subsidence.

Active Publication Date: 2020-01-17
CHINA RAILWAY 20 BUREAU GRP
View PDF8 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

During the actual tunnel construction, the main problems of tunnel excavation in the soil-rock boundary stratum are as follows: first, the hardness of the rock and soil is not uniform, and the blasting of the weathered rock layer in the lower part will easily cause the upper soil layer to collapse, which is harmful to the construction personnel; second, the groundwater The enrichment area further softens the soil-rock boundary strata, causing serious deformation of the surrounding rock; third, the swelling of the expansive soil with water causes the primary support to deform and crack, and in severe cases, the deformed structure of the primary support arch will be damaged and the support capacity will be lost
Once the corresponding reasonable support measures are not adopted in the actual construction or the excavation method is improper, it is very likely to cause deformation of the support in front of the face of the tunnel, and even serious consequences of collapse

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Tunnel three-step synchronous excavation construction method based on partition explosion
  • Tunnel three-step synchronous excavation construction method based on partition explosion
  • Tunnel three-step synchronous excavation construction method based on partition explosion

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0111] Such as figure 1 The shown three-step synchronous excavation construction method based on zoned blasting, the cross-section of the constructed tunnel is greater than 100m 2 And it is located in the earth-rock boundary strata; combined with Figure 7 , the soil-rock boundary stratum includes a loess layer 3 and a rock layer 4 below the loess layer 3, and the interface between the loess layer 3 and the rock layer 4 is an earth-rock interface; the tunnel hole 1 of the constructed tunnel is divided from top to bottom It is an upper cave body 1-1, a middle cave body 1-2 and a lower cave body 1-3. The upper cave body 1-1 is a cave body formed after excavating the upper steps of the constructed tunnel from back to front, The middle hole 1-2 is a hole formed by excavating the tunnel under construction from the back to the front, and the lower hole 1-3 is the tunnel under construction from the back to the front. In the last formed cave body, the soil-rock interface is located ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a tunnel three-step synchronous excavation construction method based on partition explosion. Excavation construction is performed on a construction tunnel according to a plurality of excavation sections from back to front. The method comprises the following steps of 1 surveying and setting-out, 2 drill explosion construction, 3 upper hole excavation, 4 middle hole excavation, 5 lower hole excavation, 6 next excavation section excavation construction, 7 repeated execution of the step 6 till all the excavation construction processes of the construction tunnel are completed. The design is reasonable, construction is easy and convenient, and the using effect is good, explosion region division is performed on an upper explosion region and a middle explosion region, the arrangement positions of shot holes inside the explosion regions are limited, the phenomena that when the large-section one-time explosive load is excessively large, intensive vibration is generated byexplosion, and tunnel faces collapse or vaults collapse can be effectively avoided, it is ensured that the tunnel excavation process is safe and reliable, and the tunnel structure stability can be ensured; and meanwhile, by adopting the three-step synchronous excavation mode, the weak surrounding rock penetrating tunnel excavation process can be safely and successfully completed.

Description

technical field [0001] The invention belongs to the technical field of tunnel construction, and in particular relates to a tunnel three-step synchronous excavation construction method based on zoned blasting. Background technique [0002] In the construction process of railway and highway tunnel projects, due to the limitation and influence of geological conditions, it will cause great influence and difficulties to the construction during the construction process. In the process of tunnel construction, various combinations of rock formations are often encountered, such as weak and uneven surrounding rock, shallow buried bias landform, soil-rock mixed geology and so on. For the excavation and support of tunnels that pass through soil-rock mixed strata (also known as soil-rock interface geology or soil-rock boundary strata), at present, the main methods in China are advanced pipe shed grouting support, advanced horizontal jet grouting pile reinforcement, and controlled excavat...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E21D9/00E21D11/00F42D1/00F42D3/04E21D11/10E21D11/18
CPCE21D9/00E21D9/006E21D11/00E21D11/102E21D11/105E21D11/18F42D1/00F42D3/04
Inventor 谢江胜王建军马传明刘之涛郭尚坤张会安仲维玲曹运祥高王峰申运涛吴小波梁永峰
Owner CHINA RAILWAY 20 BUREAU GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products