Tunnel three-step synchronous excavation construction method based on partition explosion
A construction method and three-step technology, which can be used in blasting, tunnels, tunnel linings, etc., and can solve problems such as deformation and structural damage of the primary arch frame, collapse of the upper soil layer, and subsidence.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0111] Such as figure 1 The shown three-step synchronous excavation construction method based on zoned blasting, the cross-section of the constructed tunnel is greater than 100m 2 And it is located in the earth-rock boundary strata; combined with Figure 7 , the soil-rock boundary stratum includes a loess layer 3 and a rock layer 4 below the loess layer 3, and the interface between the loess layer 3 and the rock layer 4 is an earth-rock interface; the tunnel hole 1 of the constructed tunnel is divided from top to bottom It is an upper cave body 1-1, a middle cave body 1-2 and a lower cave body 1-3. The upper cave body 1-1 is a cave body formed after excavating the upper steps of the constructed tunnel from back to front, The middle hole 1-2 is a hole formed by excavating the tunnel under construction from the back to the front, and the lower hole 1-3 is the tunnel under construction from the back to the front. In the last formed cave body, the soil-rock interface is located ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com