Tailings pond modular cyclone classification dam building system and implementation method
A technology for tailings ponds and plastics, which is used in filling, dams, buildings, etc., can solve the problems of long construction period and high labor cost, and achieve the effects of improving construction efficiency, high degree of mechanization and low cost.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0030] The present invention will be described in further detail below in conjunction with the accompanying drawings.
[0031] Such as figure 2 As shown, a tailings pond modular cyclone classification dam building system and its implementation method, the system includes: sand settling and rolling surface 1, water-filled and embedded pressure-bearing plastic box 2, hydrocyclone 3, crawler-type scraper 4. Rubber hose for overflow mine 5, rubber hose for mine feed 6, slurry pump 7, power distribution cabinet 8, agitator 9, stirring dilution tank 10, high water tank 11, tailings conveying supervisor 12, high Sink accident overflow pipe 13, building high platform 14, water delivery main pipe 15, forming tailings dam 16 and other main parts; wherein the sand setting and rolling surface 1 is the top surface at a certain elevation of the tailings dam; The inside of the pressed plastic box 2 is filled with water, and several plastic boxes are stacked vertically to form a group (the ...
PUM
| Property | Measurement | Unit |
|---|---|---|
| height | aaaaa | aaaaa |
| radius | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 


