Embodiment 1
[0037] A preparation method of modified asphalt based on surface energy theory, first small test and then large test, the specific operation steps are:
[0038] (1) Heating the asphalt to a molten state
[0039] Heat the asphalt in the asphalt tank in an oven at 155°C for 2.5 hours to make it completely molten. The volume of the asphalt should not exceed 3L, otherwise, the heating time of 2.5 hours cannot make it completely melted.
[0040] (2) Weigh pitch and epoxy silane coupling agent according to mass ratio
[0041] Pour the asphalt in (1) into a new asphalt tank and weigh its mass as 2000g, and weigh the epoxy silane coupling agent according to the mass ratio of different asphalt.
[0042] (3) Add epoxy silane coupling agent to asphalt while stirring
[0043] Put the asphalt weighed in (2) into the intelligent heating jacket, set the heating temperature of the heating jacket to 155°C, firstly, heat the asphalt for 35 minutes to restore the molten state; turn on the high...
Embodiment 2
[0078] A preparation method of modified asphalt based on surface energy theory, first small test and then large test, the specific operation steps are:
[0079] (1) Heating the asphalt to a molten state
[0080] Heat the asphalt in the asphalt tank in an oven at 145°C for 1.5 hours to make it completely melted. The volume of the asphalt should not exceed 3L, otherwise, the heating time of 1.5 hours cannot make it completely melted.
[0081] (2) Weigh pitch and silane coupling agent according to mass ratio
[0082] Pour the asphalt in (1) into a new asphalt tank and weigh its mass as 2000g, and weigh the epoxy silane coupling agent according to the mass ratio of different asphalt.
[0083] (3) Add epoxy silane coupling agent to asphalt while stirring
[0084] Put the asphalt weighed in (2) into the intelligent heating jacket, set the heating temperature of the heating jacket to 145°C, first, heat the asphalt for 25 minutes to restore the molten state; turn on the high-speed s...
Embodiment 3
[0119] Best practice:
[0120] A preparation method of modified asphalt based on surface energy theory, first small test and then large test, the specific operation steps are:
[0121] (1) Heating the asphalt to a molten state
[0122] Heat the asphalt in the asphalt tank in an oven at 150°C for 2 hours to make it completely melted. The volume of the asphalt should not exceed 3L, otherwise, the heating time of 2 hours cannot make it completely melted.
[0123] (2) Weigh pitch and silane coupling agent according to mass ratio
[0124] Pour the asphalt in (1) into a new asphalt tank and weigh its mass as 2000g, and weigh the epoxy silane coupling agent according to the mass ratio of different asphalt.
[0125] (3) Add epoxy silane coupling agent to asphalt while stirring
[0126] Put the asphalt weighed in (2) into the intelligent heating jacket, set the heating temperature of the heating jacket to 150°C, firstly, heat the asphalt for 30 minutes to restore the molten state; t...
PUM